CloudJira Cloud2022-03-28Minor version update Released 2022-03-28 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialMinor version update5.7.1-Jira8-9Jira Data Center 8.10.0 - 9.11.32023-03-03increasing load performance Version 5.7.1-Jira8-9 • Released 2023-03-03 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.7.1-Jira8-9Jira Server 8.10.0 - 9.11.32023-03-038.12.2 Version 5.7.1-Jira8-9 • Released 2023-03-03 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.7.0-Jira8-9Jira Data Center 8.5.0 - 9.6.02022-07-21bug fixes and compatibility for Jira 9.x Version 5.7.0-Jira8-9 • Released 2022-07-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.7.0-Jira8-9Jira Server 8.5.0 - 9.6.02022-07-21bug fixes and compatibility for Jira 9.x Version 5.7.0-Jira8-9 • Released 2022-07-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.9-Jira8-9Jira Data Center 8.7.0 - 9.0.02022-07-04Compatibility release for Jira 9 and some bug fixes Version 5.6.9-Jira8-9 • Released 2022-07-04 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.9-Jira8-9Jira Server 8.7.0 - 9.0.02022-07-04Compatibility release for Jira 9 and some bug fixes Version 5.6.9-Jira8-9 • Released 2022-07-04 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.8-Jira8Jira Data Center 8.2.0 - 8.22.62022-01-12bug fix concerning time zones Version 5.6.8-Jira8 • Released 2022-01-12 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.8-Jira8Jira Server 8.2.0 - 8.22.62022-01-12bug fix concerning time zones Version 5.6.8-Jira8 • Released 2022-01-12 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.7c-Jira8Jira Data Center 8.2.0 - 8.21.12021-12-18important update Version 5.6.7c-Jira8 • Released 2021-12-18 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- fix of time zone problems (shift by day within the calendar)
- this version does not deliver any copy of the Apache Log4J library (see CVE-2021-44228)
5.6.7c-Jira8Jira Server 8.2.0 - 8.21.12021-12-18important update Version 5.6.7c-Jira8 • Released 2021-12-18 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- fix of time zone problems (shift by day within the calendar)
- this version does not deliver any copy of the Apache Log4J library (see CVE-2021-44228)
5.6.6-Jira8Jira Data Center 8.1.0 - 8.20.282021-07-11bug fix release and compatibility with Jira v8.18 Version 5.6.6-Jira8 • Released 2021-07-11 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.6-Jira8Jira Server 8.1.0 - 8.20.282021-07-11bug fix release and compatibility with Jira v8.18 Version 5.6.6-Jira8 • Released 2021-07-11 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.5-Jira8Jira Data Center 8.0.0 - 8.17.02021-03-21bug fix release Version 5.6.5-Jira8 • Released 2021-03-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.5-Jira8Jira Server 8.0.0 - 8.17.02021-03-21bug fix release Version 5.6.5-Jira8 • Released 2021-03-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.6.4-Jira8Jira Data Center 8.0.0 - 8.15.12021-01-22feature release and compatibility with Jira 8.15 Version 5.6.4-Jira8 • Released 2021-01-22 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialimproved Gantt-Chart gadget on Jira dashboard: configure preselected project or filter as well as displayed view
5.6.4-Jira8Jira Server 8.0.0 - 8.15.12021-01-22feature release and compatibility with Jira 8.15 Version 5.6.4-Jira8 • Released 2021-01-22 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialimproved Gantt-Chart gadget on Jira dashboard: configure preselected project or filter as well as displayed view
5.6.3-Jira8Jira Data Center 8.0.0 - 8.14.12020-11-30feature release Version 5.6.3-Jira8 • Released 2020-11-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- inline-edit of additional fields like fixVersion, sprint, epic link etc.
- create issues on Gantt-Chart
- support of multiple languages
- improved rescheduling
- improved quick filters associated to chosen view
- bug fixes
5.6.3-Jira8Jira Server 8.0.0 - 8.14.12020-11-30feature releae Version 5.6.3-Jira8 • Released 2020-11-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- inline-edit of additional fields like fixVersion, sprint, epic link etc.
- create issues on Gantt-Chart
- support of multiple languages
- improved rescheduling
- improved quick filters associated to chosen view
- bug fixes
5.5.6-Jira8Jira Data Center 8.0.0 - 8.13.62020-09-02feature release Version 5.5.6-Jira8 • Released 2020-09-02 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialimprovements of re-scheduling for agile projects as well as classic ones
5.5.6-Jira8Jira Server 8.0.0 - 8.13.62020-09-02feature release Version 5.5.6-Jira8 • Released 2020-09-02 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialimprovements of re-scheduling for agile projects as well as classic ones
5.5.5-Jira8Jira Data Center 8.0.0 - 8.11.12020-07-31Security Fix Version 5.5.5-Jira8 • Released 2020-07-31 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Ignore hacks within names of Gantt Quick Filters like "<script>...</script>" by authenticated users
5.5.5-Jira8Jira Server 8.0.0 - 8.11.12020-07-31Security Fix Version 5.5.5-Jira8 • Released 2020-07-31 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Ignore hacks within names of Gantt Quick Filters like "<script>...</script>" by authenticated users
5.5.4-Jira8Jira Server 8.0.0 - 8.11.12020-07-30Security Fixes and improved Scrolling Version 5.5.4-Jira8 • Released 2020-07-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- avoid execution of scripts embedded within Jira filter names while displaying/selecting on Gantt-Charts: properly display manipulated names of saved Jira filters (treatment of names like "<script>alert('HERE I AM')</script>")
- on-premise: REST-calls for saving user settings are restricted to the related logged in user herself/himself and can no longer be by-passed (authenticated users could attack others by generating a REST-call in the browser manipulating the settings of other users)
- vertical scrolling has been improved to avoid mis-aligning between the three areas of information in each row
5.5.4-Jira8Jira Data Center 8.0.0 - 8.11.12020-07-30Security Fixes and improved Scrolling Version 5.5.4-Jira8 • Released 2020-07-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- avoid execution of scripts embedded within Jira filter names while displaying/selecting on Gantt-Charts: properly display manipulated names of saved Jira filters (treatment of names like "<script>alert('HERE I AM')</script>")
- on-premise: REST-calls for saving user settings are restricted to the related logged in user herself/himself and can no longer be by-passed (authenticated users could attack others by generating a REST-call in the browser manipulating the settings of other users)
- vertical scrolling has been improved to avoid mis-aligning between the three areas of information in each row
5.5.3-Jira8Jira Server 8.0.0 - 8.10.12020-06-22bug fix release and compatibility with Jira v8.10 Version 5.5.3-Jira8 • Released 2020-06-22 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.3-Jira8Jira Data Center 8.0.0 - 8.10.12020-06-22bug fix release and compatibility with Jira v8.10 Version 5.5.3-Jira8 • Released 2020-06-22 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.2-Jira8Jira Data Center 8.0.0 - 8.9.12020-06-14bug fix release and compatibility with Jira v8.9 Version 5.5.2-Jira8 • Released 2020-06-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.2-Jira8Jira Server 8.0.0 - 8.9.12020-06-14bug fix release and compatibility with Jira v8.9 Version 5.5.2-Jira8 • Released 2020-06-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.0Jira Data Center 8.0.0 - 8.8.12020-04-19New global views, improved rescheduling Version 5.5.0 • Released 2020-04-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.0Jira Server 8.0.0 - 8.8.12020-04-19New global views, improved rescheduling Version 5.5.0 • Released 2020-04-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.0-Jira7Jira Data Center 7.5.0 - 7.13.182020-05-23New global views, improved rescheduling Version 5.5.0-Jira7 • Released 2020-05-23 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.5.0-Jira7Jira Server 7.5.0 - 7.13.182020-05-23New global views, improved rescheduling Version 5.5.0-Jira7 • Released 2020-05-23 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.4.2-Jira8Jira Data Center 7.5.0 - 8.8.12019-12-30UI improvements and compatibility release for Jira 8.6 Version 5.4.2-Jira8 • Released 2019-12-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.4.2-Jira8Jira Server 7.5.0 - 8.8.12019-12-30UI improvements and compatibility release for Jira 8.6 Version 5.4.2-Jira8 • Released 2019-12-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.4.0Jira Data Center 7.5.0 - 8.5.142019-11-06enhanced resource management Version 5.4.0 • Released 2019-11-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- availability per user per day
- utilization per project in percent
- bug fixes
Have a look at my demo videos:
- Resource-Mgt. Part 1: https://youtu.be/j2WccAHV1x4
- Resource-Mgt. Part 2: https://youtu.be/DdM_-apy4JE
5.4.0Jira Server 7.5.0 - 8.5.142019-11-06enhanced resource management Version 5.4.0 • Released 2019-11-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- availability per user per day
- utilization per project in percent
- bug fixes
Have a look at my demo videos:
- Resource-Mgt. Part 1: https://youtu.be/j2WccAHV1x4
- Resource-Mgt. Part 2: https://youtu.be/DdM_-apy4JE
5.3.1Jira Data Center 7.5.0 - 8.5.142019-09-10Bug fix release Version 5.3.1 • Released 2019-09-10 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- support of scenarios and filters on Gantt dashboard items
- store large data sets of issues for scenarios like "Baseline"
- selecting a filter automatically enables that one
- some minor bug fixes
5.3.1Jira Server 7.5.0 - 8.5.142019-09-10Bug fix release Version 5.3.1 • Released 2019-09-10 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- support of scenarios and filters on Gantt dashboard items
- store large data sets of issues for scenarios like "Baseline"
- selecting a filter automatically enables that one
- some minor bug fixes
5.3.0Jira Data Center 7.5.0 - 8.3.99999992019-09-08feature relaese Version 5.3.0 • Released 2019-09-08 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- issue filters on Gantt-Chart
- multi-milestones per collapsed parent issue of (all milestones of children)
- improved rendering of dates to avoid mis-understandings of month/days (format) and visa versa
- bug fixes
5.3.0Jira Server 7.5.0 - 8.3.99999992019-09-08feature release Version 5.3.0 • Released 2019-09-08 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- issue filters on Gantt-Chart
- multi-milestones per collapsed parent issue of (all milestones of children)
- improved rendering of dates to avoid mis-understandings of month/days (format) and visa versa
- bug fixes
5.2.1Jira Data Center 7.5.0 - 8.3.52019-09-01improvements and bug fixes Version 5.2.1 • Released 2019-09-01 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- improved support of Jira Software and Jira Portfolio
- improved calculation of suggestions based on time tracking (estimated effort in time) or story points (estimated as complexity)
- bug fixes
5.2.1Jira Server 7.5.0 - 8.3.52019-09-01improvements and bug fixes Version 5.2.1 • Released 2019-09-01 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- improved support of Jira Software and Jira Portfolio
- improved calculation of suggestions based on time tracking (estimated effort in time) or story points (estimated as complexity)
- bug fixes
5.2.0Jira Data Center 7.4.0 - 8.3.52019-08-27feature release Version 5.2.0 • Released 2019-08-27 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- provide scenarios for what-if analysis, comparisons with current plan as well as merge into current plan (extension of the concept of simple baselines to a more complex and flexible approach): per scenario, you can change all planning dates, optionally configured milestone dates (often: due date) as well as the related assignee and store this without overwriting the current plan's original data.
- UI fixes and minor enhancements
- bug fixes
5.2.0Jira Server 7.4.0 - 8.3.52019-08-27feature release Version 5.2.0 • Released 2019-08-27 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- provide scenarios for what-if analysis, comparisons with current plan as well as merge into current plan (extension of the concept of simple baselines to a more complex and flexible approach): per scenario, you can change all planning dates, optionally configured milestone dates (often: due date) as well as the related assignee and store this without overwriting the current plan's original data.
- UI fixes and minor enhancements
- bug fixes
5.1.0Jira Data Center 7.4.0 - 8.3.52019-08-09Bug fixes and compatibility release for Jira Data Center Version 5.1.0 • Released 2019-08-09 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.1.0Jira Server 7.4.0 - 8.3.52019-08-10Bug fixes and compatibility release for Jira Data Center Version 5.1.0 • Released 2019-08-10 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.0.7Jira Server 7.4.0 - 8.3.52019-07-02bug fixes and additional features Version 5.0.7 • Released 2019-07-02 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- support of Microsoft IE 11, which does not properly support modern EC-standards
- avoid displaying Gantt-Chart in the side bar under "apps" duplicating the Gantt icon
- some bug fixes like determining Jira's baseurl (in some rare cases, it could not retrieved properly) and fix for drag'n drop rows in the Gantt-Chart for manual re-sorting planning dates etc.
- integration of traffic-lights for Jira to be displayed as column in the middle area of Gantt-Charts
5.0.5Jira Server 7.4.0 - 8.2.62019-06-12new features and some bug fixes Version 5.0.5 • Released 2019-06-12 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- new gadget to put a Gantt-Chart on your dashboard
- new option to export as XLS-file
- new individual holidays per user, taken care by rescheduling etc.
- interactively remove dependencies by clicking on arrow/line between issues on a Gantt-Chart
- bug fixes
5.0.4Jira Server 7.4.0 - 8.2.62019-05-23optimized automatic suggestions and enabled auto-rescheduling by default Version 5.0.4 • Released 2019-05-23 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.5.0.3Jira Server 7.4.0 - 8.1.32019-05-20support of holidays and extended grouping Version 5.0.3 • Released 2019-05-20 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- specify all non-business days based on pre-defined calendars with public, bank and observance holidays available for 144 countries as well as manually maintain other holidays
- the column "parent" will be omitted within the export if no issue has got a parent issue
- extended grouping by any custom field of type "text (single line)", "single select", "cascading select", "multi-select" as well as "label"
5.0.2Jira Server 7.4.0 - 8.1.32019-05-14automatic suggestions for planning dates and Gantt-Charts on issue-views Version 5.0.2 • Released 2019-05-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- get Gantt-Charts for Jira Core without user interaction based on issues' estimations or default of one business day as suggestions
- get Gantt-Charts without user interaction based on Jira Software sprints' start and end dates, their assigned issues and their estimated story points as suggestions
- focussed Gantt-Charts on issue views for the that issue as well as its subtasks and dependent issues (configurable per project)
- bug fixes and optimisations
5.0.1Jira Server 7.4.0 - 8.1.32019-05-07Automatic suggestions of plannings for future sprints Version 5.0.1 • Released 2019-05-07 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialBased on the average duration in working days of all prior sprints, future sprints are scheduled and their assigned issues are distributed per assignee based on their estimation in story points.
5.0.0Jira Server 7.4.0 - 8.1.32019-04-30improved performance, cleaned-up user interface Version 5.0.0 • Released 2019-04-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- new issue loader to improve performance
- new user interface (click on "yellow" element to inline edit)
- UNDO-functionality
- new internal engine to be able to handle 10.000+ issues in large scale environments
4.4.0-JIRA8Jira Server 8.0.0.m0021-eap07 - 8.1.32019-02-19compatibility release for Jira 8 Version 4.4.0-JIRA8 • Released 2019-02-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.4.0-JIRA7-8Jira Server 7.0.0 - 7.13.182019-02-19bug fixes and UI improvements Version 4.4.0-JIRA7-8 • Released 2019-02-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.3.14d-JIRA7Jira Server 7.0.0 - 7.13.182018-12-05minor fixes and compatibility update for Jira 7.13 Version 4.3.14d-JIRA7 • Released 2018-12-05 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.3.13-JIRA7Jira Server 7.0.0 - 7.12.32018-08-29bug fixes and enhancements Version 4.3.13-JIRA7 • Released 2018-08-29 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Performance improvements
- Bug fixes concerning loading large sets of issues
4.3.12-JIRA7Jira Server 7.0.0 - 7.11.22018-06-17bug fixes and compatibility with current STRUCTURE v4.6.5 by ALM-works Version 4.3.12-JIRA7 • Released 2018-06-17 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.3.11-JIRA7Jira Server 7.0.0 - 7.10.22018-06-05bug fixes within Gantt listener and compatibility with Jira 7.10 Version 4.3.11-JIRA7 • Released 2018-06-05 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.3.9-JIRA7Jira Server 7.0.0 - 7.9.22018-05-15bug fixes for Jira-Core, only Version 4.3.9-JIRA7 • Released 2018-05-15 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.3.8-JIRA7Jira Server 7.0.0 - 7.9.22018-04-23compatibility release for JIRA-7.9 Version 4.3.8-JIRA7 • Released 2018-04-23 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- compatible with Jira 7.9
- some bug fixes
4.3.7-JIRA7Jira Server 7.0.0 - 7.8.42018-02-20bug fixes and enhancements Version 4.3.7-JIRA7 • Released 2018-02-20 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.3.5-JIRA7Jira Server 7.0.0 - 7.7.42017-12-22enhanced grouping by Epics: ordered by creation/key or by global rank Version 4.3.5-JIRA7 • Released 2017-12-22 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Additional Gantt-Tips
- new grouping options: group by Epic (ordered by epic key = creation date) and group by Epic (ordered by their global rank)
- bug fixes on aggregations while grouping on epic levels
4.3.4-JIRA7Jira Server 7.0.0 - 7.6.172017-11-21compatibility release for JIRA-7.6 and some bug fixes Version 4.3.4-JIRA7 • Released 2017-11-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- compatibility adjustments for Jira v7.6
- additional Gantt-Tips
- new option to display issues' summary instead of issue key within the work-break-down structure (WBS): open Gantt menu "configure look & feel", select tab "Gantt Features" and enable option "Display summary instead of issue key"
- fix in displaying progress within Gantt-Assistant
- some other bug fixes
4.3.3-JIRA7Jira Server 7.0.0 - 7.5.42017-11-11improvements and bug fixes Version 4.3.3-JIRA7 • Released 2017-11-11 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- create (sub-)issues within Gantt-Chart
- Gantt Tips Library as new Gantt menu item
- extended tips
- bug fixes
4.3.2-JIRA7Jira Server 7.0.0 - 7.5.42017-10-21minor improvements and some bug fixes Version 4.3.2-JIRA7 • Released 2017-10-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Under Gantt menu item "configure look & feel" you can now find the new option "Display parents and children belonging to another group reflecting issue hierarchy and indents." Please deselect the related checkbox if necessary, so that the shadow parents/children are not shown on the Gantt chart.
- bug fix on exporting to SVG/PDF using various browsers, BUT Mircosoft IE is not capable to create a PDF-document, whereas all other common browsers can do that without any problem (that's a limitation of IE, without any workaround rather than using another browser for PDF-export)
- bug fix on Gantt assistant to automatically generate planning dates if not set for issues concerning input fields and button
4.3.1-JIRA7Jira Server 7.0.0 - 7.5.42017-10-11Bug fix of screen section overlapping Version 4.3.1-JIRA7 • Released 2017-10-11 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialWhat should be in front is being placed at the back based on a CSS style sheet bug being fixed by this version. Everybody having installed v4.3.0 should update to v4.3.1 in order to work properly although it was just a small bug but a large impact!
4.3.10-JIRA7Jira Server 7.0.0 - 7.10.22018-06-04compatibility release for JIRA 7.10 Version 4.3.10-JIRA7 • Released 2018-06-04 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- enhanced Gantt Assistant for generating planning dates for subtasks if their parent issues are not selected for the Gantt-Chart
- automatic set of actual end date if issue gets resolved or closed does not change the planned start nor end date
- automatic set of actual end date in case of setting an issue's remaining effort to 0d while editing
4.3.0-JIRA7Jira Server 7.0.0 - 7.5.42017-10-08new Gantt-Tips and Gantt-Assistant, improved integration with Jira Software Version 4.3.0-JIRA7 • Released 2017-10-08 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Customfield "actual start" will be set automatically, if status changes from a status category TO DO "blue" to IN PROGRESS "orange"
- Ccustomfield "actual end" will be set automatically, if status changes from a status category IN PROGRESS "orange" to DONE "green"
- Switching back from DONE "green" within the workflow unsets actual end
- Starting a sprint automatically forces a re-schedule of the related issues to start at the sprint's start date
- Deleting or removing an issue from a sprint also force a re-scheduling of all sprint's issues
- Re-ranking issues within a sprint also force a re-schedule off all sprint's issues to reflect the new order in related timing/planning.
- Specify time equivalent for a story point per project within the project administration on the Gantt section in order to mix different approaches of estimations
- New Gantt assistant to automatically generate planning dates if not set for issues
- New Gantt-Tips sharing knowledge/handling
- bug fixes
4.2.4-JIRA7Jira Server 7.0.0 - 7.5.42017-09-06compatibility release for Jira-7.5.x Version 4.2.4-JIRA7 • Released 2017-09-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.2.3-JIRA7Jira Server 7.0.0 - 7.4.62017-09-06bug fixes and minor enhancements Version 4.2.3-JIRA7 • Released 2017-09-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.2.2-JIRA7Jira Server 7.0.0 - 7.4.62017-08-13bug fixes and enhancements Version 4.2.2-JIRA7 • Released 2017-08-13 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialCreating an issue providing /entering a fixVersion having set bot, start date as well as a release date, will take over that dates to set new issue's planning start and end date according to its version.
4.2.1-JIRA7Jira Server 7.0.0 - 7.4.62017-07-05improved support of Jira-Software for agile sprints Version 4.2.1-JIRA7 • Released 2017-07-05 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.2.0-JIRA7Jira Server 7.0.0 - 7.4.62017-07-03Create and link Issues efficiently on Gantt-Chart Version 4.2.0-JIRA7 • Released 2017-07-03 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- create issue(s) on Gantt-Chart Project Panel
- improved user-interface like button for resource-utilizations etc.
using Jira-Software (agile approaches):
- configure the time equivalent of 1 story point on each (agile) project on the project summary administration panel
- automatically aggregate story points per grouping item
- automatically set start date of an issue to the start date of it's assigned sprint and calculate the issue's end date based on the time equivalent of its story points
- re-schedule all issues of sprint in case of reordering/ranking on agile boad
- bug fixes
4.1.7-JIRA7Jira Server 7.0.0 - 7.3.92017-05-31b Version 4.1.7-JIRA7 • Released 2017-05-31 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.1.7-JIRA6_2017-05-31T22-54-41ZJira Server 6.2 - 6.4.142017-05-31bug fixes and enhancements Version 4.1.7-JIRA6_2017-05-31T22-54-41Z • Released 2017-05-31 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.1.5-JIRA7Jira Server 7.0.0 - 7.3.92017-04-30improvements and bug fixes Version 4.1.5-JIRA7 • Released 2017-04-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- improved re-scheduling for finish-finish dependencies
- UI enhancements
- etc.
4.1.2-JIRA7Jira Server 7.0.0 - 7.3.92017-03-29improvements for using Mircosoft IE and bug fixes Version 4.1.2-JIRA7 • Released 2017-03-29 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.1.2-JIRA6_2017-03-29T09-58-04ZJira Server 6.1 - 6.4.142017-03-29improvements for using Mircosoft IE and bug fixes Version 4.1.2-JIRA6_2017-03-29T09-58-04Z • Released 2017-03-29 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.1.1-JIRA7Jira Server 7.0.0 - 7.3.92017-03-21enhanced export focussing on time slice rather than full timeline Version 4.1.1-JIRA7 • Released 2017-03-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- export into SVG or PDF and reduce timeline to focus on certain duration
- bug fixes for compatibility to Microsoft IE
- various other bug fixes
4.1.1-JIRA6_2017-03-21T21-47-12ZJira Server 6.2 - 6.4.142017-03-21enhanced export focussing on time slice rather than full timeline Version 4.1.1-JIRA6_2017-03-21T21-47-12Z • Released 2017-03-21 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- export into SVG or PDF and reduce timeline to focus on certain duration
- bug fixes for compatibility to Microsoft IE
- various other bug fixes
4.1.0-JIRA6_2017-03-16T18-07-53ZJira Server 6.2 - 6.4.142017-03-17new version series 4.x of Gantt-Chart being compatible with Jira 6.x Version 4.1.0-JIRA6_2017-03-16T18-07-53Z • Released 2017-03-17 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialPlease have a look on my wiki at https://polscheit.atlassian.net/wiki/display/GANTT/New+Gantt-Chart+Releases and related sub-pages:
- new rendering engine
- new integration with Confluence as Gantt-Chart column of issue search result page via Jira-Filter-Gadget etc.
- new project Gantt panel
- export to SVG and PDF (poster printing via Adobe Acrobat Reader)
- more flexible configuration of grouping and sorting
- support of user- and project-specific views (customisability)
- bug fixes
- and much more
4.0.9-JIRA7Jira Server 7.0.0 - 7.3.92017-02-01additional export option for new Gantt Project Panel Version 4.0.9-JIRA7 • Released 2017-02-01 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- export as MS-Excel file on new Gantt Project Panel
- export as MS-Project file on new Gantt Project Panel
- keep screen settings while (re-)configure global add-on settings
- do not auto-update existing issues concerning setting new default for custom field "Gantt-Chart": this has to be done by an admin via bulk-change if required in order not to use too much CPU
- fix a problem of gantt permission (visibility)
- some other bug fixes
4.0.8-JIRA7Jira Server 7.0.0 - 7.3.92017-01-24extension of new Gantt Project Panel Version 4.0.8-JIRA7 • Released 2017-01-24 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Export into SVG (scalable vector graphic)
- Export into PDF (bitmap)
- inline editing of assignee, dates & datetimes, text like summary
- config option to hide/show info columns in order to expand or shrink area for Gantt diagram on screen
- additional selection of timeline (daily, weekly, monthly etc.)
- some bug fixes
4.0.7.3-JIRA7Jira Server 7.0.0 - 7.3.92016-12-20Gantt Panel extensions Version 4.0.7.3-JIRA7 • Released 2016-12-20 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- earned value analysis: new columns for CPI, SPI, SVa and SVb
- support of setting row's background color based on configured custom field (single-line text)
- support of setting display of datetime-customfields to just dates
- some minor fixes
4.0.7.2-JIRA7Jira Server 7.0.0 - 7.2.152016-12-19UI fixes and smaller improvements Version 4.0.7.2-JIRA7 • Released 2016-12-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- ability to enable/disable "show Gantt-bar for issue" on single issue page via new checkbox on issue edit screen
- some CCS-style corrections etc.
4.0.7.1-JIRA7Jira Server 7.0.0 - 7.2.152016-12-17extensions of Gantt Panel, coloring and bug fixes Version 4.0.7.1-JIRA7 • Released 2016-12-17 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialChristmas-Release containing
- Gantt Panel: shift columns left/right
- Gantt Panel: inline editing of date/datetime custom fields
- coloring (user-specific, project's default, global default)
- various improvements of the UI/usability and CCS-styles
- bug fixes
4.0.6-JIRA7Jira Server 7.0.0 - 7.2.152016-12-06extension of new Gantt-Panel and bug fixes Version 4.0.6-JIRA7 • Released 2016-12-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- custom fields of type "URL" display their content on the information area left of the gantt diagram by default. If you click on "display web-page", the native web-site will be embedded like a linked Confluence/wiki page
- look & feel settings (here: coloring) being configured via old Gantt-Panel will be used for displaying gantt bars on the new panel, now
- fixed bug for properly displaying automation of Jira Service Desk having enabled Gantt-Chart for Jira
4.0.5-JIRA7Jira Server 7.0.0 - 7.2.152016-11-25improved and extended new Gantt Panel Version 4.0.5-JIRA7 • Released 2016-11-25 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- add/remove displayed columns on Gantt Panel
- add/remove grouping columns on Gantt Panel
- modify column width via drag'n drop on Gantt Panel
- save/delete changes as user-individual gantt view
- save/delete changes as project default being logged in as admin user (project admin or system admin)
- auto-reschedule dependent issues after moving an issue
- by default: scroll horizontally to display today if within time range
- some bug-fixes like:- auto-update resource utilization if shifting issues,- proper display of issues if just using Jira Core (no agile) etc.
4.0.4-JIRA7Jira Server 7.0.0 - 7.2.152016-11-20extending new gantt panel Version 4.0.4-JIRA7 • Released 2016-11-20 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.0.3-JIRA7Jira Server 7.0.0 - 7.2.152016-10-30bug fix release and new Gantt-Panel Version 4.0.3-JIRA7 • Released 2016-10-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialBased on the new rendering engine introduced with Gantt-Chart v.4.0, a new Gantt-Panel is available in addition to the prior but deprecated Gantt-Panel That one is labeled "old", now. The new Gantt-Panel on the left side of a project is about 4-5 times faster than the old one! Additionally, new Gantt-Views are introduced: one default view and 2 agile views focussing on sprints for agile teams or epics for Product Owners. In all views, you can select issues by filter or agile board: so, multi-project views are possible! Another new feature: display parent of issue and edit that to generate multi-level work-break down structures (WBS) - just enable edit-mode and select the parent of an issue, which may is a prent of another issue etc. That's implemented by using Jira's issue link type "parent-child relationship", created by the Gantt-Chart add-on.
Some bug fixes avoiding unnecessary looping and some coloring bugs are also fixed.
4.0.2-JIRA7Jira Server 7.0.0 - 7.2.152016-09-18improvements of STRUCTURE-integration and bug fixes Version 4.0.2-JIRA7 • Released 2016-09-18 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.4.0.1-JIRA7Jira Server 7.0.0 - 7.2.152016-09-06compatibility release for Jira-7.2 and others Version 4.0.1-JIRA7 • Released 2016-09-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- compatibility release for Jira 7.2.x
- compatible with TEMPO add-on (prior versions cause layout incompatibilities)
- improvements of Gantt-Charts integrated within STRUCUTURES supporting issue hierachies reflecting on Gantt-Chart automatically
- improvements of Gantt-Charts within issue search result page
- bug fixes
4.0.0-JIRA7Jira Server 7.0.0 - 7.1.102016-08-11Integration into Structures v3.x, Issue Pages, Issue Search Results etc. Version 4.0.0-JIRA7 • Released 2016-08-11 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Improved timeline (zoom in/out via double-click on blue timeline)
- Improved rendering of dependencies within new Gantt views
- Improved creation of issue dependencies within new Gantt views
- Integration into Jira's native issue search via new column "Gantt-Chart"
- Integration into STRUCTURE v3.x(third-party add-on by ALM-works) supporting multiple instances of same issues, folders etc.
- Integration into Jira's issue page by showing an excerpt: current issue, its subtasks as well as dependent issues (incoming and outgoing)
- Integration into Jira's dashboard as new Gantt-Chart column on a "Filter Result"-Gadget for more flexibility
- Integration into a Confluence page via Jira "Filter Result"-Gadget having configured a Gantt-Chart column
- Improved Resources Overview and Utilizations grouped by assignee and (multi-)project
3.3.2-JIRA7_2016-05-01T10-51-44ZJira Server 7.0.0 - 7.1.102016-05-01UI enhancements Version 3.3.2-JIRA7_2016-05-01T10-51-44Z • Released 2016-05-01 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- proper display of milestone dependencies when the prior or next issue is not visible on screen
- click on a collapsed milestone to auto-expand and auto-scroll to related milestone row
- display of labels on the left/right of milestones, too
- fixed grouping bug to use the same sequence of issue like the result of related filter having an order-by clause
- some other bug fixes
3.3.2-JIRA6_2016-04-28T20-26-46ZJira Server 6.0 - 6.4.142016-04-28UI enhancements Version 3.3.2-JIRA6_2016-04-28T20-26-46Z • Released 2016-04-28 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- proper display of milestone dependencies when the prior or next issue is not visible on screen
- click on a collapsed milestone to auto-expand and auto-scroll to related milestone row
- display of labels on the left/right of milestones, too
- fixed grouping bug to use the same sequence of issue like the result of related filter having an order-by clause
- some minor bug fixes
3.3.1-JIRA7_2016-03-28T16-20-00ZJira Server 7.0.0 - 7.1.102016-03-28improvements of user interface and bug fixes for Jira 7.x Version 3.3.1-JIRA7_2016-03-28T16-20-00Z • Released 2016-03-28 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialIf you are running Jira 6.x, please download the compatible version (see "all versions" tab): this add-on version needs Jira 7.x!
- integration of traffic-light
- display of versions within timeline
- improvement of caching
- bug fixes
3.3.1-JIRA6_2016-03-28T12-19-01ZJira Server 6.0 - 6.4.142016-03-28improvements of user interface and bug fixes for Jira 6.x Version 3.3.1-JIRA6_2016-03-28T12-19-01Z • Released 2016-03-28 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- integration of traffic-light
- display of versions within timeline
- improvement of caching
- bug fixes
3.3.0-JIRA7_2016-02-14T10-18-23ZJira Server 7.0.0 - 7.1.102016-02-14compatibility release for Jira 7.x: new features and improvements Version 3.3.0-JIRA7_2016-02-14T10-18-23Z • Released 2016-02-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- use workflow actions as well as issue operations in addition to the „view card“ of an issue by moving the mouse over a gantt bar and clicking on the context menu icon, which pops up (see screenshot)
- optimization of user interface and handling for move/resize as well as link issues
- performance improvements like issue linking on Gantt-Chart and local session based caching
- enhanced scheduling engine to take about intraday times and properly link short time/intraday issues as well as adapted utilization for intraday counting
- compatibility release for Jira 7.x analog to v3.3.0 for Jira 6.x
3.3.0-JIRA6_2016-02-11T09-17-41ZJira Server 6.0 - 6.4.142016-02-12intraday scheduling, improved moving & linking, bug fixes Version 3.3.0-JIRA6_2016-02-11T09-17-41Z • Released 2016-02-12 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- use workflow actions as well as issue operations in addition to the „view card“ of an issue by moving the mouse over a gantt bar and clicking on the context menu icon, which pops up (see screenshot)
• optimization of user interface and handling for move/resize as well as link issues
• performance improvements like issue linking on Gantt-Chart and local session based caching
• enhanced scheduling engine to take about intraday times and properly link short time/intraday issues as well as adapted utilization for intraday counting
bug fixes like proper row heights (v3.2.8 had a problem by continously extending the row height within different browsers)
- use workflow actions as well as issue operations in addition to the „view card“ of an issue by moving the mouse over a gantt bar and clicking on the context menu icon, which pops up (see screenshot)
3.2.7-JIRA7_2015-12-20T23-17-25ZJira Server 7.0.0 - 7.0.112015-12-20Jira 7: improved integration with STRUCTURE, strict permission handling Version 3.2.7-JIRA7_2015-12-20T23-17-25Z • Released 2015-12-20 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- improved integration with STRUCTURE increasing performance
- strict permission handling: if project is enabled for Gantt-Chart, you must be the project lead of member of configured project role or group to view on gadget as well as on project tab panel
- proper creation of milestones even if re-scheduling listener is disabled
- minor adjustments of layout (gadget as well as project tab panel)
- bug fixes
3.2.6-JIRA6_2015-12-17T20-42-49ZJira Server 6.0 - 6.4.142015-12-17for Jira 6.x: improvement of using STRUCTURES and bug fixes Version 3.2.6-JIRA6_2015-12-17T20-42-49Z • Released 2015-12-17 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.3.2.5-JIRA7_2015-10-10T17-51-57ZJira Server 7.0.0 - 7.0.112015-10-10compatibility release for Jira 7 Version 3.2.5-JIRA7_2015-10-10T17-51-57Z • Released 2015-10-10 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialsimilar to Gantt-Chart v3.2.5 for Jira 6, but ported to Jira Core 7
3.2.5-JIRA6_2015-10-08T21-04-11ZJira Server 6.0 - 6.4.142015-10-09improvements and bug fixes Version 3.2.5-JIRA6_2015-10-08T21-04-11Z • Released 2015-10-09 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- improved performance using Structures (ALMworks) together with Gantt-Charts
- improved re-scheduling while maintaining project's or users' calendars, setting (non-)working days
- improved handling of multi-projects mode
- restricted access to Gantt-Chart for project leads (special privilege) and members of configured Jira group and/or project role only
- fixes of reported bugs
3.2.4-JIRA6_2015-09-10T19-43-37ZJira Server 6.0 - 6.4.142015-09-14improved handling (fast issue creation, issue linking for WBS, etc.) Version 3.2.4-JIRA6_2015-09-10T19-43-37Z • Released 2015-09-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- using mouse wheel to scroll down/up within Gantt-Chart
- improved fast issue creation including mark as milestone
- improved export to MS-Project
- improved issue hierarchies (WBS) via issue linking on Gantt-Chart
- bug fixes etc.
3.2.3-JIRA6_2015-08-27T09-59-30ZJira Server 6.0 - 6.4.142015-08-27user requirements and bug fixes Version 3.2.3-JIRA6_2015-08-27T09-59-30Z • Released 2015-08-27 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- new option within Gantt Feature (look & feel): Display dates without time
- new option for Gantt bars (look & feel): Display related Epic as superscript text within Gantt-Bar
- default progress bar in green layered on top of utilisation
- correct look & feel of Gantt-Charts launched out of STRUCTURE menu
- fixed "stuck on loading" in some special cases
- fixed possibility to delete dependencies to non-displayed issues
- etc.
3.2.2-JIRA6_2015-07-24T08-37-08ZJira Server 6.0 - 6.4.142015-07-27bug fixes Version 3.2.2-JIRA6_2015-07-24T08-37-08Z • Released 2015-07-27 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- avoid loading/displaying issues twice
- proper handling of multi-projects
- display available project roles within project administration for Gantt
- fixed JQL problem using Structures
- and others
3.2.1-JIRA6_2015-07-19T17-03-21ZJira Server 6.0 - 6.4.142015-07-19export data to MS-EXCEL, bug fixes Version 3.2.1-JIRA6_2015-07-19T17-03-21Z • Released 2015-07-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- new export of data to MS-Excel
- sorting of components by their names instead of using their IDs
- fix of wrong aggregations while grouping in some special cases
- ensure correct alignment of left/right side of diagram
- etc.
3.2Jira Server 6.0 - 6.4.142015-06-29Improvements of performance, zoomable timeline, easy issue creation etc. Version 3.2 • Released 2015-06-29 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- improved performance by multiple times (20x up to factor 50x depending on number of retrieved issues)
- zoomable timeline with auto-adjustment of time unit selection
- flexible grouping for Jira filters as well as agile boards, too
- new feature to easily create new issues having an optional effort and Gantt-dependency
- other minor improvements
3.1.9-JIRA6Jira Server 6.0 - 6.4.142015-03-22Compatibility to Jira 6.4, bug fixes and enhancements Version 3.1.9-JIRA6 • Released 2015-03-22 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.3.1.8-JIRA6Jira Server 6.0 - 6.3.152014-11-28check Jira's baseUrl vs. request URL Version 3.1.8-JIRA6 • Released 2014-11-28 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialIn order to properly work, Jira's baseUrl has to be set correctly as it is used to access/load images and content from the Jira server into the browser. A check is implemented to ensure consistency between configured baseUrl and used URL within the browser.
3.1.6-JIRA6Jira Server 6.0 - 6.3.152014-11-28new project/global defaults, enhanced config options, bug fixes Version 3.1.6-JIRA6 • Released 2014-11-28 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- bug fixes
- config of project and global defaults for displayed columns
- config of grouping columns using any other (custom)field together with epic name
- config of global default JQL to be used in case of "no filter" selection on Gantt-Chart
- limit displayed issue to a certain time frame like -4w to 12w in addition to the used JQL based on filter/board/structure
- Gantt-Gadget: time frame (from/to) added to gadget config
- Gantt-Gadget: new button to clear selected filter/reset to default
- Gantt bars are displayed within the color of their related status by default
- and others
3.1.5-JIRA6Jira Server 6.0 - 6.3.152014-08-30Compatibility upgrade for Jira 6.3.x and minor enhancements Version 3.1.5-JIRA6 • Released 2014-08-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- compatible with Jira 6.3.x
- new time range selection (from-to) in addition to Jira filters
- bug fixes
3.1.4-JIRA6Jira Server 6.0 - 6.2.72014-05-19bug fixes, improvements of user interface, compatibility with structure v2.7.0 Version 3.1.4-JIRA6 • Released 2014-05-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.3.1.2-JIRA6Jira Server 6.0 - 6.2.72014-04-30configurable grouping and bug fixes Version 3.1.2-JIRA6 • Released 2014-04-30 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- ability to individually configure columns for grouping rather than taking the columns out of the ORDER-BY-clause of the related JQL
- set of improvements concerning usability like auto-adjustment of information panel in case of mouse-over close to visual borders of the Gantt diagram etc.
- set of bug fixes
3.1.1-JIRA6Jira Server 6.0 - 6.2.72014-02-25support IE v10 and v11, Jira 6.2 as well as bug fixes Version 3.1.1-JIRA6 • Released 2014-02-25 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNew in this release
In case of any unexpected behaviour on the screen, please open your browser's console (IE: hit F12, Chrome: tools->dev.tools, Firefox: use add-on FireBug etc.) to get additional infos.
3.1.1-JIRA5Jira Server 5.1 - 5.2.112014-02-25support IE 10 and 11 and bug fixes Version 3.1.1-JIRA5 • Released 2014-02-25 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNew in this release
In case of any unexpected behaviour on the screen, please open your browser's console (IE: hit F12, Chrome: tools->dev.tools, Firefox: use add-on FireBug etc.) to get additional infos.
3.1.0-JIRA6Jira Server 6.0 - 6.1.92014-02-13integration of resource planning into Gantt-Charts Version 3.1.0-JIRA6 • Released 2014-02-13 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNew in this release
- Gantt-Gadget having the new v.3x look & feel
- "Resource Planning" is obsolete: integrated within Gantt-Charts now (just specify "assignee" within the ORDER-BY clause of your related JQL/filter)
- enhanced EPIC support:
- display sum of story points and calculate epic’s progress by sum of story points of tasks being done divided by sum of all related stories/tasks
- epic’s planning dates are set to min./max. of related and displayed stories/tasks
- configurable to enable Gantt-Charts for all projects
Fixed in this release
- Compatibility with Microsoft IE v.10 and v.11, Chrome, Firefox, Safari, Opera
- Cooperation with ALMworks STRUCTURE 2.6.0
- Cooperation with Jira-Agile
3.1.0-JIRA5Jira Server 5.2 - 5.2.112014-02-13integration of resource planning into Gantt-Charts Version 3.1.0-JIRA5 • Released 2014-02-13 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNew in this release
- Gantt-Gadget having the new v.3x look & feel
- "Resource Planning" is obsolete: integrated within Gantt-Charts now (just specify "assignee" within the ORDER-BY clause of your related JQL/filter)
- enhanced EPIC support:
- display sum of story points and calculate epic’s progress by sum of story points of tasks being done divided by sum of all related stories/tasks
- epic’s planning dates are set to min./max. of related and displayed stories/tasks
- configurable to enable Gantt-Charts for all projects
Fixed in this release
- Compatibility with Microsoft IE v.10 and v.11, Chrome, Firefox, Safari, Opera
- Cooperation with ALMworks STRUCTURE 2.6.0
- Cooperation with Jira-Agile
3.0.0-JIRA6Jira Server 6.0 - 6.1.92013-11-19new user interface and enriched feature set Version 3.0.0-JIRA6 • Released 2013-11-19 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNew in this release
- support of multi-projects within Gantt-Charts (additional option)
- two load options (loading while scrolling down as default and initial loading at once)
- configurable columns
- configurable look & feel
- build multi-level issue hierarchies based on issue linking (WBS)
- display swimlanes with issue-individual background coloring
- powerful search & mark issues
- bulk operations (set baseline as the first available operation)
Fixed in this release
- support of Jira Agile and related agile boards
- support of ALM-works STRUCTURE
2.4-JIRA5.1-UPM2.10Jira Server 5.1 - 5.1.82013-07-06velocity/load percentage per issue and per assignee Version 2.4-JIRA5.1-UPM2.10 • Released 2013-07-06 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNow, you can specify a velocity (load percentage) per individual issue. Prerequisite: you have to put the customfield "Velocity %" to your edit/view screen.
Additionally, any user can maintain his/her availability in form of a velocity (load percentage) per project: just expand the personal menu by clicking on the login name on the top right corner of the window and select menu item "Personal Calendar for Gantt-Chart", than select the new tab "my projects" and enter your velocities, e.g. 50 for an individual project, which you support part-time (50% job). As project manager, you'll see and can maintain the availablities of the assignable users on the project administration.
2.3-JIRA5.0-UPM2.10Jira Server 5.0 - 5.0.72013-05-12Draw Baselines, MS-Project import/export Version 2.3-JIRA5.0-UPM2.10 • Released 2013-05-12 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNew features:
- draw baseline as original planning within same line in light blue (initial work logging copies current planning dates into their related baseline customfield; alternatively, you can set up a workflow post function "setBaseline" to copy that dates)
- import from MS-Project files
- export into MS-Project using Microsoft's XML-based file format
Changes:
- reverse version order analog to Jira's native version selection lists
Some bug fixes
2.2.2-JIRA5.2-UPM2.9.1Jira Server 5.2 - 5.2.112013-03-26Bug Fix Release and some improvements Version 2.2.2-JIRA5.2-UPM2.9.1 • Released 2013-03-26 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Bug Fixes:
- display milestones
- fixed one-day shift based on UTC and local time differences
- fullscreen mode supports all functionalities like normal mode, now
- others minor bug fixes
- Extensions/Improvements:
- switch between fullscreen and normal mode without reloading (performance increase)
- using absolute date for timeline (from - to) displays exactly that timeline independent of the issues, whereas relative timeline (e.g. -4w until 12w) optimizes to min/max of issues
- new LAB-functionality (EAP): import from Microsoft Project on project admin tab
- Bug Fixes:
2.2.2-JIRA5.1-UPM2.9.1Jira Server 5.1 - 5.1.82013-03-27see similar version 2.2.2 for Jira5.2.x Version 2.2.2-JIRA5.1-UPM2.9.1 • Released 2013-03-27 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.2.2.2-JIRA5.0-UPM2.9.1Jira Server 5.0 - 5.0.72013-03-27see similar version 2.2.2 for Jira5.2.x Version 2.2.2-JIRA5.0-UPM2.9.1 • Released 2013-03-27 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.2.2-JIRA5.2-UPM2.9.1Jira Server 5.2 - 5.2.112013-03-17inline editing e.g. planning dates and other extensions Version 2.2-JIRA5.2-UPM2.9.1 • Released 2013-03-17 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- inline-editing of issue summary
- editing of assignee including entering a comment stays (communicate via comments!)
- inline-editing of planned start and end date
- ability to enter the start/end TIME of an issue in addition to a date and the related display option (hourly)
- for project admins: get a calendar overview of all assignable users and their availabilities and being able to maintain (set/unset) them in addition to user's individual actions
- being able to set a project's start and end date
- improved "generate planning dates ..." functionality for older projects already having a lot of issues without planning dates
2.2.1-JIRA5.1-UPM2.9.1Jira Server 5.1 - 5.1.82013-03-18see similar Version 2.2-Jira5.2-UPM2.9.1 Version 2.2.1-JIRA5.1-UPM2.9.1 • Released 2013-03-18 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialv2.2 for Jira 5.1.x having the same functionality as
Version 2.2-Jira5.2-UPM2.9.1
2.1.8.2-JIRA5.2-UPM2.8Jira Server 5.2 - 5.2.112013-02-01Bug-fix release Version 2.1.8.2-JIRA5.2-UPM2.8 • Released 2013-02-01 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- correct calculation of quarters within the timeline
- correct display of Gantt-Chart and Resource-Planning using Mircosoft IE8 (support for embedded Gantt-Charts within Jira's Issue Navigator will be within next following release)
- correction of milestone handling
- other bug fixes as communication by various users
2.1.8-JIRA5.2-UPM2.8Jira Server 5.2 - 5.2.112013-01-14Handling of Greenhopper EPICs and some bug fixes Version 2.1.8-JIRA5.2-UPM2.8 • Released 2013-01-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Handling of Greenhopper EPICs
- some bug fixes
- updated compatibility with Atlassian Universal Plugin Manager (UPM) version 2.8
2.1.8.2-JIRA5.1-UPM2.8Jira Server 5.1 - 5.1.82013-02-01Bug-fix release Version 2.1.8.2-JIRA5.1-UPM2.8 • Released 2013-02-01 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercialsee release notes of Gantt-Chart v2.1.8.2 for Jira 5.2.x
2.1.8-JIRA5.1-UPM2.8Jira Server 5.1 - 5.1.82013-01-14Handling of Greenhopper EPICs and some bug fixes Version 2.1.8-JIRA5.1-UPM2.8 • Released 2013-01-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Handling of Greenhopper EPICs
- some bug fixes
- updated compatibility with Atlassian Universal Plugin Manager (UPM) version 2.8
2.1.8-JIRA5.0-UPM2.8Jira Server 5.0 - 5.0.7.12013-01-14Handling of Greenhopper EPICs and some bug fixes Version 2.1.8-JIRA5.0-UPM2.8 • Released 2013-01-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Handling of Greenhopper EPICs
- some bug fixes
- updated compatibility with Atlassian Universal Plugin Manager (UPM) version 2.8
2.1.7-JIRA5.2-UPM2.7.8Jira Server 5.2 - 5.2.112012-12-14Improved handling of sub-issues and some minor bug fixes Version 2.1.7-JIRA5.2-UPM2.7.8 • Released 2012-12-14 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.2.1.7-JIRA5.1-UPM2.7.10Jira Server 5.1 - 5.1.82013-01-04Improved handling of sub-issues and some minor bug fixes Version 2.1.7-JIRA5.1-UPM2.7.10 • Released 2013-01-04 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.2.1.7-JIRA5.0-UPM2.7.10Jira Server 5.0 - 5.0.7.12013-01-03Improved handling of sub-issues and some minor bug fixes Version 2.1.7-JIRA5.0-UPM2.7.10 • Released 2013-01-03 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialNo release notes.2.1.6JIRA5.2-UPM2.7.7Jira Server 5.2 - 5.2.112012-11-15suport of Jira 5.2 and the new Issue Navigator Version 2.1.6JIRA5.2-UPM2.7.7 • Released 2012-11-15 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • Commercial- Initial release for Jira 5.2, supporting the new Issue Navigator:
just add a new column (config columns) "Gantt-Chart" out of the list of available columns and get an integrated Gantt-Chart within the Issue Navigator. - Support for STRUCTURE's (ALM-works) coming release 2.0, being compatible with Jira 5.2
Pre-view/latest snapshot of pre-v.2.1.7 available as part of my Early-Adapter-Program (EAP) on my server at http://www.polscheit.de/plugins/jira/gantt-chart/gantt-2.1.7-JIRA5.2-UPM2.7.8.jar as well as for Jira 5.0 and 5.1
- Initial release for Jira 5.2, supporting the new Issue Navigator:
2.1.6JIRA5.1-UPM2.7.7Jira Server 5.1 - 5.1.82012-11-02enhanced re-scheduling using Greenhopper's Rapid Board Version 2.1.6JIRA5.1-UPM2.7.7 • Released 2012-11-02 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialImprovements:
- enhanced re-scheduling of issues while re-ordering (ranking) or assign/remove issue to/from Greenhopper sprint
- having installed a prior license provided by me and installing an Atlassian Marketplace license, yet: in that case of dual-licensing, my license key will be removed automatically if the valid date is less than that of the Marketplace license by hitting "apply" on the plugin's configuration panel to avoid conflicts
Bug fixes:
- display version (as hierarchy if specified using Greenhopper's classic board) as parent of sprints properly
2.1.6JIRA5.0-UPM2.7.7Jira Server 5.0 - 5.0.72012-11-02enhanced re-scheduling using Greenhopper's Rapid Board Version 2.1.6JIRA5.0-UPM2.7.7 • Released 2012-11-02 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialImprovements:
- enhanced re-scheduling of issues while re-ordering (ranking) or assign/remove issue to/from Greenhopper sprint
- having installed a prior license provided by me and installing an Atlassian Marketplace license, yet: in that case of dual-licensing, my license key will be removed automatically if the valid date is less than that of the Marketplace license by hitting "apply" on the plugin's configuration panel to avoid conflicts
Bug fixes:
- display version (as hierarchy if specified using Greenhopper's classic board) as parent of sprints properly
2.1.6JIRA4.4.5-UPM2.7.7Jira Server 4.4.52012-11-03Upgrade to the 2.x-feature set for older Jira 4.4.5 Version 2.1.6JIRA4.4.5-UPM2.7.7 • Released 2012-11-03 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Atlassian • CommercialFirst time, being able to get an Atlassian Marketplace license for my Gantt-Chart AddOn for the old Jira 4.4.5, which is every often still in use by larger companies and organisations.
In case of any question, please do not hestiate to contact me at frank@polscheit.de
Please see the release notes of:
- version 2.0.0 - 2.0.4 as well as
- version 2.1.0 - 2.1.6
Restrictions:
- no support for Greenhopper's Rapid Board as this is available since Greenhopper 6 not running together with the old Jira 4.4.5
- no support for displaying ALM-work's STRUCTUREs via additional menu items within the Structure-top level menu
HINT: I recommend to update Atlassian's Universal Plugin Manager (UPM) to version 2.7.7 before installing this plugin to avoid exceptions based on incompatibilities with old UPM versions!
1.7.5Jira Server 5.0 - 5.0.72012-05-03Jira 5.0: minor fixes Version 1.7.5 • Released 2012-05-03 • No Vendor Support • Paid via Vendor • Commercial- improved handling of filters on Project-Tab Gantt-Charts
- rounded display of efforts
- disabling of donation button due to migration to Atlassian Marketplace
Published new version 2.0.0 for Jira 5.x on the Atlassian Marketplace on May 27th, 2012.
Depending on Atlassian's approval process, you can download it and/or buy a license there when available.
1.7.4Jira Server 5.0 - 5.0.72012-03-24Jira 5.0: button for full-screen mode, minor fixes 1.7.3Jira Server 5.0 - 5.0.72012-03-03Jira 5.0: fixed some minor problems and smaller enhancments of usability 1.7.2Jira Server 5.0 - 5.0.72012-02-23Jira 5.0 final: display i18n-messages correctly 1.7.1Jira Server 5.0 - 5.0.72012-02-22Jira 5.0: some fixes to catch up with v1.6.10/11 1.7.0Jira Server 5.0 - 5.0.72011-12-27Jira 5.0 compatibility 1.6.15Jira Server 4.4 - 4.4.52012-08-04Jira 4.4: minor extension for project admins etc. Version 1.6.15 • Released 2012-08-04 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Vendor • Commercial- Project admins can change project's configuration for Gantt-Chart.
- other minor topics, requested by customers and already distributed as part of my Early-Adapter-Program (EAP)
1.6.14Jira Server 4.4 - 4.4.52012-06-11Jira 4.4 bug fixes: usage of the "config"-button updated Version 1.6.14 • Released 2012-06-11 • Supported By Frank Polscheit - Solutions & IT-Consulting • Paid via Vendor • CommercialNo release notes.1.6.13Jira Server 4.4 - 4.4.52012-05-03Jira 4.4: minor fixes 1.6.11Jira Server 4.4 - 4.4.52012-03-23Jira 4.4: full-screen mode, minor fixes for Powerpoint export, displayed filters on Gantt-TabPanel Version 1.6.11 • Released 2012-03-23 • No Vendor Support • Paid via Vendor • Commercial - no chargeMinor fixes:
- Full-Screen mode having no scrollbars within the browser
- Powerpoint Export: display progress in % per Gantt-bar
- correct display of Gantt-bar for versions having set a due date (milestone)
- display own and favorite filters on ProjectTabPanel for Gantt-Chart only (no shared filters), if more than 50 filters are retrieved
- adjust size of message panel for interactive moving issues, so that it fit within Gantt-Gadget
1.6.10Jira Server 4.4 - 4.4.52012-02-12Jira 4.4: support of French, some minor enhancements and fixes 1.6.9Jira Server 4.4 - 4.4.52012-01-14Jira 4.4 : enhanced resource planning, filters on project tab gantts,bugfixes Version 1.6.9 • Released 2012-01-14 • No Vendor Support • Free • Commercial - no chargeEnhancements:
- Project Tab Panel: use your own or shared filters effecting the current project to select issues, like on Gantt-Gadgets: if a filter selects issues of other projects, those are not displayed and ignored here.
- Resource-Planning: display of cumulated average hours per day per assignee.
The average hours of an issue per day is calculated before today as logged work in the past divided by working days between start date and today. The average hours in the future including today are calculated as remaining effort divided by the working days between today and planned end date. - Resource-Planning: over-capacities are displayed as RED cumulated hours per day on the assignee's row and a warning sign is shown on the left. If you move the move this sign, a tooltip popups showing the first day with over-capacity (helpful for fast finding in case of a longer time period).
- Gantt-Gadget: export to Microsoft Powerpoint via an additional button below the Gantt-Chart.
Bug fixes:
- Display of project specific gantt configuration. In some circumstances, no Gantt section was displayed on the right bottom side as well as no tab on the left.
- Displaying of progress bars did not fit the value as shown within the left table in some circumstances.
- Other minor bug fixes.
Debugging support:
- Within the browsers console, the used JQL-statement is displayed.
- Within the browsers console, some performance figures are displayed.
1.6.8Jira Server 4.4 - 4.4.52011-12-18Jira 4.4: specify weekend days and allow working on weekends per project Version 1.6.8 • Released 2011-12-18 • No Vendor Support • Free • Commercial - no charge- specify the days of weekends on main plugin administration, globally
- specify explicite working days on weekends per project just by clicking on the related day within the project calendar
- optimization of resource-planning view to display all issues as small boxes within the related assignee row (top-level only) instead of their direct parent row (cascading) as within Gantt-Chart view
1.6.7Jira Server 4.4 - 4.4.52011-12-14Jira 4.4: interactive move of issues on the Gantt-Chart, resourceplanning enhancements Version 1.6.7 • Released 2011-12-14 • No Vendor Support • Free • Commercial - no chargeNew interactive functionality:
- move the mouse over an issue gantt bar, press down left mouse button, hold it down and move left/right to shift the gantt bar in time: interactively determine the new planned START date
- move the mouse over an issue gantt bar, press down right mouse button, hold it down and move left/right to shift the gantt bar in time: interactively determine the new planned END date
Shifting issues in time is available for users having "edit" permission for the related issue, only!Additional enhancements:- For Admins: new project tab "Gantt-Chart" having an additional button for automatically calculate necessary planning dates (start/end) for all issues of the related project based on original estimation and today or being set analog to their sprint(s) in case of Greenhopper.
- resouce planning view displays all related issues, regarding of their hierarchy level, as small boxes within the resource row. At a glance, you can see the assignee's allocation vs. free time
- all Gantt actions on the popup menu will be shown be extending the height of the gadget or area within the project tab panel to best fit
- some bug fixes:
- spaces within usernames do not cause any missing issues on the related Gantt-Chart any more
- Powerpoint-Export fix
- some Calendar fixes
1.6.6Jira Server 4.4 - 4.4.52011-12-06Jira 4.4: optimizations in displaying Gantt-Gadget and minor bug fixes 1.6.5Jira Server 4.4 - 4.4.52011-11-03initial Chinese translations, bug fixes in export and displaying issues Version 1.6.5 • Released 2011-11-03 • No Vendor Support • Free • Commercial - no charge- Chinese translations for Gantt-Chart Project-Tab Panel and Resource-Planning (thank's to Nicky)
- clear messages/hints while clicking on "update"-button to avoid multiple instances
- correct export of issues, containing a comma within their issue summary
- correct display of left grouping triangle
- correct display of Greenhopper non-working days
- some other bug fixes stabelizing plugin's usage
1.6.4Jira Server 4.4 - 4.4.52011-10-23calendars of non-working days (global and per project), improved resource management Version 1.6.4 • Released 2011-10-23 • No Vendor Support • Free • Commercial - no chargeNew feature(s):
- Gantt-Calendars displaying non-working days on Gantt-Chart and Resource-Diagrams, taken into account within (re-)scheduling.
- A global Gantt-Calendar helps to reduce maintance efforts. All non-working days are automatically taken over by each project.
- Per project, you can set individual non-working days like local holidays or frozen zones. If you have similar projects, you can copy a calendar from another project to the current one.
- Improved Resource-Diagram: sub-issues having another assignee than their parent issue are displayed as standalone issue but displaying the sub-issue icon to indicate this circumstance.
Bug fix:- (Re-)scheduling of start/end date caused some problems in time zones with negative hours to GMT.
1.6.3Jira Server 4.4 - 4.4.52011-10-06minor bug fix for v.1.6.2 on displaying Gantt-Charts Version 1.6.3 • Released 2011-10-06 • No Vendor Support • Free • Commercial - no chargeMinor bug fixes:
- If you have assigned all issues within your time period to a version, the artificial version "unassigned" is empty. This causes a run-time error within the script, displaying no Gantt-Chart but drawing a line per non-empty version on the screen only: fixed now.
- Dates on the header of the time line as well as today's date within the powerpoint export were not matching the configured date format: fixed now.
- Dependency arrows were shifted by one day within the powerpoint export, fixed too.
Please read the release notes of v.1.6.2 as well, if you are not familiar with them!
1.6.2Jira Server 4.4 - 4.4.52011-10-05Jira 4.4: Export generating MS-Powerpoint files, link versions to issues, restrict viewing Version 1.6.2 • Released 2011-10-05 • No Vendor Support • Free • Commercial - no charge- flexible Export
- generation of a Microsoft Powerpoint file on the server without the need of Microsoft Licenses
- automatic download to the client and possibility to modify everything (I am using native powerpoint elements for the exportet Gantt-Charts)
- auto-scaling to fit on one horizontal slide:
daily: up to time periods of 8 weeks
weekly: up to 20 weeks
monthly: up to 8 months
quarterly: up to 1.5 years
- automatic vertical slide breaks taking linkage into account
- Linking from version(s) to issue and visa versa as basis for more complex multi-project test- and release-management
- Display additional column on left side of Gantt-/Resource-Charts: original estimated effort per issue as well as summed up on version level
- Restrict visibility of Gantt-/Resource-Charts to specified project role members, only. If everybody shall view them, setup a general project role like "users" (default by Jira) and select this one.
- Bug Fixes
- (re-)scheduling takes time zones into account for weekend detection and other date-based calculations
- no gadget-refresh and flickering, if you move the mouse over a Gantt-Bar
- some minor bugs of displaying and coloring - Introduction of a License Management
- flexible Export
1.6.1Jira Server 4.4 - 4.4.52011-09-08Jira 4.4 + Greenhopper 5.7, multi-project resource-planning as gadget, other improvements Version 1.6.1 • Released 2011-09-08 • No Vendor Support • Free • Commercial - no chargeCompatibility with Jira 4.4 and bundled Greenhopper 5.7.1 (if enabled and used: version start/end dates and version hierachies are taken for Gantt-Charts and re-scheduling)
Gantt-Gadget:
- multi-project capable view for resource-planning (issues ordered by assignee)
- correct Project/Filter-Selection within Gadget when re-edit the configuration
Gantt-Chart:
- transparent, small gantt bars on folded parents in order to visualize issue overlapping
- displaying icons for issues types
- hyperlinks on versions and projects within the left chart side
- correct displaying of gantt bar width using weekly, monthly or quarterly time periods
- improved aggregations on parent levels
Resource-Planing:
- displaying of related project and version(s)
- transparent, small gantt bars on folded parents in order to visualize issue overlappings
- displaying icons for issues types
1.6.0Jira Server 4.4 - 4.4.52011-09-02Jira 4.4: enhanced resource-planning, improved issue linking and a lot smaller improvements Version 1.6.0 • Released 2011-09-02 • No Vendor Support • Free • Commercial - no chargeSame functionalities within both published Gantt-Chart releases of today:
- v1.5.6 with compatibility for Jira 4.3 and optional Greenhopper 5.6.x
- v1.6.0 with compatibility for Jira 4.4 with disabled Greenhopper 5.7
Within Jira 4.4, there seems to be a problem in loading Greenhopper 5.7.1 classes within my plugin causing http-500 errors. Having Greenhopper disabled, everything should work. I will try to find a suitable solution as fast as possible and publish this in v1.6.1.
1.5.10Jira Server 4.3 - 4.3.42011-12-25Jira 4.3: upgrade analog to v1.6.8 including shift of gantt bars etc. 1.5.9Jira Server 4.3 - 4.3.42011-12-06Jira 4.3: optimizations in displaying Gantt-Gadget and minor bug fixes 1.5.8Jira Server 4.3 - 4.3.42011-11-02Jira 4.3: bug fixes and close-up to v.1.6.5 (Jira 4.4) like Powerpoint-Export Version 1.5.8 • Released 2011-11-02 • No Vendor Support • Free • Commercial - no chargeBug fixes:
- Clear messages and hints while hitting the "update"-button on the project tab panel
- Correct displaying of resource views, if show versions is disabled
Close-up to Gantt-Chart v.1.6.5:
- Export to Powerpoint
- non-Working Day Calenders (global + Greenhopper-specific + project-specific)
- Project-specific Gantt-Settings as new operation like on Project-Summary of Jira 4.4
- Adjusted Grennhopper handling equivalent to v.1.6.5
- Use shared code-basis for main functionality
- License Management like described on the Gantt-WIKI page
1.5.7Jira Server 4.3 - 4.3.42011-09-04Jira 4.3: bug fix for Gantt-Options like milestones Version 1.5.7 • Released 2011-09-04 • No Vendor Support • Free • Commercial - no chargeBased on maintaining two parallel versions (v1.5.6 for Jira 4.3 and v1.6.0 for Jira 4.4), I copied a source code sequence to v1.5.6, which used a Jira API-call available in 4.4 only: within Jira 4.3, this cause internal server error (http-500) due to diferent return types of the Jira API. This is fixed in v1.5.7.
1.5.6Jira Server 4.3 - 4.3.42011-09-02Jira 4.3: enhanced resource-planning, improved issue linking and a lot smaller improvements 1.5.5Jira Server 4.3 - 4.3.42011-08-10version order within Gantt-Chart analog to project's order and warning of overdue versions Version 1.5.5 • Released 2011-08-10 • No Vendor Support • Free • Commercial - no charge- [JiraGANTT-51] Release Versions are displayed in wrong order: fixed
- overdue versions get a warning sign on the left hand side of the Gantt-Chart
1.5.4Jira Server 4.3 - 4.3.42011-08-06visualisation of capacity utilisation, wiki-style renderer of desc. on info panel and some bug fixes Version 1.5.4 • Released 2011-08-06 • No Vendor Support • Free • Commercial - no chargeNew features:
- capacity utilisation is displayed within Gantt-Bars as light-blue area from bottom to top
- information panel (?) on Gantt-Bars: duration has been added to show possible buffers, which are differences between estimations and efforts versus duration in time
- information panel (?) on Gantt-Bars: descriptions are displayed using the WIKI-style renderer, if configured within field scheme
Changes:
- completion-% color has been changed to dark-green, so that an issue, which is 100% done, will be "green"
Bug fixes:
- horizontal scrolling in IE, Firefox, Chrome and Safari fixed
- Ressource-Planing: closed issues and issues with no remaining work are omitted
- error in calculation of duration in working days has been fixed
- width of left table header columns are better synchronized with body column widths
- clicking on another timeline unit changes width of left table header and body columns
1.5.3Jira Server 4.3 - 4.3.42011-07-293 minor fixes Version 1.5.3 • Released 2011-07-29 • No Vendor Support • Free • Commercial - no chargeGantt Gadget:
- [JiraGANTT-41] - Selection in Gadget is not preserved when re-edited
- [none] - Mouse over none issue (proj., vers.) caused exception: fixed
Resource Planning:
- [JiraGANTT-60] - Resource Planning not working
1.5.2Jira Server 4.3 - 4.3.42011-07-27set of minor but detailled fixes (see release notes) Version 1.5.2 • Released 2011-07-27 • No Vendor Support • Free • Commercial - no chargeGantt-Chart Gadget:
- if using your own filter as criteria, only issues contained within the filter result set are displayed (previously, all related sub-issues were also shown, regardless if they were in the filter result set or not)
Gantt-Chart Panel:
- status descriptions are displayed using their translations (i18n) if available
- fix linking from normal issue to a milestone issue and vice versa
- better show completion of grouping issues
Resource Planning Panel:
- show unassigned issues separated
1.5.0Jira Server 4.3 - 4.3.42011-06-25interactive issue actions & operations, change of assignees,resourcemgt., more translations Version 1.5.0 • Released 2011-06-25 • No Vendor Support • Free • Commercial - no charge- full support of Jira issue security
- interactive direct issue actions and operations by click on the related Gantt-bar
- "new sub-issue" as Gantt-action: allows any issue hierachy, like sub-issue creation of a sub-issue etc. fully integrated into Jira standard features (breadcrumb etc.)
- change of the assignee by click on the related name on the left side of the diagramm or on the Gantt-bars label (if configured to be shown)
- short issue overview focussed on management by click on the question mark (?) on the related Gantt-bar (comments are displayed taking security/visibility definitions into account)
- issue linking force automatic re-scheduling of dependent issue, if Gantt-listener has been enabled
- additional project tab panel for resource management (issue grouping by assignee): initial release of this new sub-modul
- i18n / available translations:
- German
- English
- Japanese
- Russian
1.4.0Jira Server 4.3 - 4.3.42011-04-07Jira 4.3.x, scrolling within Gantt-Charts, Greenhopper version enhancements, i18n, bug fixes Version 1.4.0 • Released 2011-04-07 • No Vendor Support • Free • Commercial - no chargeRelease Notes - Jira Gantt-Chart Plugin - Version 1.4.0
ATTENTION: Due to a major change of the user manager (embedded crowd) by Atlassian, Jira versions previous to 4.3 are no longer compatible with Gantt-Chart Plugin 1.4.0! That's the reason, why I have renamed the version from originally 1.3.6 to 1.4.0 to reflect that major impact.
Currently supported languages
- German
- English
- If you are interested in additional languages and want to help, please send me an email at frank@polscheit.de, so that I can provide you with a list of terms for translation. After receiving it back, I will integrate this into the next release.
Bugs
- [JiraGANTT-37] - GH parent-child versions shown in reverse order
- [JiraGANTT-38] - GH child version start/end date overlapped by parent version's start/end date
- [JiraGANTT-40] - Project tab: Cannot move divider bar between issue list and Gantt-Chart
Improvement
- [JiraGANTT-20] - Full localization i18n for tab and for gadget
- [JiraGANTT-36] - L&R Scroll Bars hidden from page
- [JiraGANTT-43] - Jira 4.3 compatibility
- If you haven't configure the Gantt-Plugin and click on related ProjectTabPanel, you will be redirected to the config-page automatically.
- Microsoft IE (9) caches even AJAX calls (http-304) and do not transfer data to the server in all necessary cases. That's the reason, why some settings are not stored properly. By using pragma-nocache etc. for http1.0 and 1.1, this is fixed now.
- Gray shading of daily timeline columns, which are out of the specified time range but necessary to display to partly fitting Gantt-bars (these issues, which start earlier or ended later than the choosen time range).
- Time ranges can be relative like "-4w" to "12w" and absolute, now: like 2011-03-01 to 2011-04-30
New Feature
- [JiraGANTT-42] - Support for Greenhopper versioning and sub-versioning in issue list and gantt-chart
other Requests- [JiraGANTT-33] - Communication ERROR
- [JiraGANTT-39] - Gadget remains empty when based on filter
1.3.6Jira Server 4.0 - 4.2.42011-12-26Jira 4.2: upgrade to same functionality as v1.6.8 Version 1.3.6 • Released 2011-12-26 • No Vendor Support • Free • Commercial - no charge- export to Microsoft Powerpoint
- drag'n drop of gantt bar to shift issues direct within the gantt chart taking working days into account
- issue linking via gantt bars to other issues or version (!)
- issue operations and actions menu on gantt bars
- issue management summary/information on gantt bars
- non-working calendars per project and globally
- Greenhopper integration
- etc.
Please read the information about my current donation model and licenses carefully. If you have any question, just contact me by email at frank@polscheit.de!
1.3.5Jira Server 4.0 - 4.2.42011-03-07IE-support, bug fixes, additional configurations Microsoft IE is capable to display Gantt-Charts correctly, now. Due to Microsoft's limitations on the number of CSS styles as well as files, this was previously not possible and I had to rewrite the source code in order to prevent CSS files (see my release note of 1.3.3).
Within the Gantt-Admin page on "Administration", you can additionally:
- choose to automatically install the Gantt-Listener as internal listener, like Greenhopper does
(!) Delete the Gantt-lister of older plugin versions, if installed, before clicking on this checkbox and saving this settings in order to prevent 2 listeners in parallel (I have changed the listener's name!) - choose the date format for Gantt-Charts, globally
Various Bug fixes:
- Gantt dependencies between a milestone and another milestone as well as other Gantt bars is displayed correctly, now.
- One JavaScript variable has not bee initialized and cause problems within Microsoft IE: fixed.
- Re-scheduling has been advanced by auto-correction of start/end dates: switching them, if start date is later than end date.
- Re-scheduling of sub-issues has been corrected: extracting the previous date for calculation of a daily distance out of the issue's history and parsing this to valid dates need to take the user's locale into account.
- choose to automatically install the Gantt-Listener as internal listener, like Greenhopper does
1.3.4Jira Server 4.0 - 4.2.42011-02-27Sprint-Support, Gantt-Admin SAVE- and ProjectTabPanel CONFIG-button and loading problems fixed Additional functionality:
Enhanced Gantt-Listener for issue creation and update: Greenhopper sprint/version having a start and end date are used and put into issue planning dates.
Fixes of the following problems:
- a stripped domain name within the baseurl in some Jira instances returned by the Atlassian function applicationProperties.getString(APkeys.Jira_BASEURL) cause various problems, which should be solved, now. This effects various functions:
- Save-Button on Gantt-Admin Panel stores settings now
- Config-Button on the GanttTabPanel is shown correctly
- loading of issues should work via Ajax-call (baseurl dependent) - lost of user authentication within in servlets results in an user object == null, which causes other side effects. As topic 1, this occurs not generally, but in some Jira instances, making it hard to analyse as I could not reproduce this on my own envrionments.
- the Gantt-Listener updates the customfield "Gantt" or the configured equivalent by another option for manual re-scheduling. If this customfield was not available, the listener could not be installed and fired an exception: fixed now.
Thanks to the community for all the feedback. Special thanks to Jonatan Urfalino for his efforts in installing a lot of plugin variants and sending back debugging results. Without his help, it would have last much longer!
If you are using Microsoft IE, please have a look at the release notes of plugin version 1.3.3, too!
- a stripped domain name within the baseurl in some Jira instances returned by the Atlassian function applicationProperties.getString(APkeys.Jira_BASEURL) cause various problems, which should be solved, now. This effects various functions:
1.3.3Jira Server 4.0 - 4.2.42011-02-20Various bug fixes on configurations and compatibility for Jira 4.2.4 (!) Installation hints
- delete older Gantt-listener
- update to 1.3.3
- insert (again) the Gantt-listener (or after reverse order 2. and 1.)
- configure Gantt-admin panel on main admistration page of Jira
Beside fixing all known and reported bugs (thank's to the community), this release includes:
- improved handling of user errors
- improved re-scheduling of dependent issues as well as shifting of related sub-issues
- enhanced configurations, like specification of planning date customfields and link type
- compatibility with current Jira version 4.2.4
- multi-browser tested 100% for: Mozilla Firefox, Google Chrome, Apple Safari and
partly for: Microsoft IE 9/8
Known Problems concerning Mircosoft Browser IE:
- IE7/8: Gantt-Gadget might be rendered false
Project-Tab-Panel is working fine in compatibility mode - IE9: Gantt-Gadget is rendered correctly
Project-Tab-Panel needs to be loaded twice via "F5"-Key as not all CSS-Files are loaded
The Mircosoft IE-Browsers have got a limitation of processing 31 CSS-Files only. Additional files are just skipped and ignored without any comment or hint! This is a NOT well-known error of these browsers, but a few other project have tapped into that trap as well. Unfortunately, Atlassian's plugin framework already uses a lot of CSS-files, so that my own CSS-file is number 32 and not loaded. As the files are cached within the browser, a re-load of the page results in the correct presentation/view: the CSS-files, already available from the browser cache, are not loaded again and do not count, so that the remaining CSS-files are load, now.
1.3.2Jira Server 4.0 - 4.2.42011-02-06Greenhopper support, autom. Re-Scheduling, enhanced Configurability UPGRADE INFORMATION:
Before installation, delete the Gantt listener if you have configured it, before!
Enter your preferences on the Gantt-Administration screen and SAVE.Additional Functionalities:
- integration of Greenhopper versions having set a start and end date as well as version hierachies
- enhanced listener for: see detailed docu. on edit-panel of listener
- auto-generation of planned Start/End dates (issue creation event)
- autom. re-schedule of following linked issues as well as sub-issues (issue update event)- global Gantt-Administration:
- specify your instance-individual Gantt-Admin. group and project-role
- map planned start/end date and Gantt-customfield to enable renaming for internationalizationUpdated Functionalities:
- calculation of %-Complete has been changed to: logged-work * 100 / (logged-work + remaining-rest)
- status icon and status description as title (on-mouse-over), configurable as Gantt bar label
- line breaks (\n) within issue summaries are replaced by ", " to fit into a single line
- multi-browser support and tested with Firefox, Microsoft IE, Google Chrome and Apple Safari
- a lot of minor enhancements1.3.1Jira Server 4.0 - 4.2.42011-02-06Smaller bug fix on Gantt-Chart Project-Tab-Panel No release notes.1.3Jira Server 4.0 - 4.2.42010-12-23Gantt-Gadget with configurable issue filter or project as well as grouping by versions You can add a new Gantt-Gadget on a dashboard with individual configurations:
- Issues are selected by specify an individual filter or via a project AND relative time line (from - to)
- Specify the time line in days, weeks, months or quarters
- The left side of the Gantt chart, displaying information fields, can be specified in pixel
Issues will be grouped by their 'fixVersion' on the project tab panel and by 'project' and 'fixVersion' within a gadget.
Multi-Project handling is support within a gadget, including dependency links between issues of different projects.
If a version has set a release date, this date will be displayed as milestone. If the end date of a version, aggregated from its issues, is greater then this release date, the milestone is red.
All grouping elements, like projects and versions, will display their direct children as small time line in case of folded mode.
Re-Factoring of the HTML-code generation for a Gantt-Chart to increase performance.
(!) Pay attention using Microsoft Internet Explorer 8 or above: do not use the compatibility mode! Older IE version cause boxing problems etc. interpreting the HTML-code.
Bug-Fixes:
- Long issue summaries are no longer cutting off a row.
- Apostrophs within summaries are escaped in order to work well, now.
- Some smaller bug fixes.
1.2.2Jira Server 4.0 - 4.2.42010-11-07skip issues having no plannedStart/End date and mark time critical issue dependencies in red - Display only issues having set "planningStart" and "planningEnd", regardless if set manually or automatically synchronized.
- Only mark time critical issue dependencies (arrows from one issue to another) in RED all other in neutral BLUE.
Also useful for management aspects:- Traffic-Light Status CustomField-Type:
https://plugins.atlassian.com/plugin/details/29738
1.2.1Jira Server 4.0 - 4.2.42010-11-07optional auto-sync of planning dates to due date and original estimation You can configure a new listener (de.polscheit.jira.listener.GanttPlanningDatesSync) on the Jira administration page as documented in Confluence for automatic sync. of "plannedEnd" with the due date (same date or previous working day) and calculation of "plannedStart" taking original estimations into account as well as general settings like working hours per day and working days per week.
Still having both planning dates, it is possible to have a due date on Sunday and an automatically calculated "plannedEnd" on the previous working day, e.g. Friday having 5 working days per week.
You can manually enter different planning dates afterwards, but these values will be overwritten the next time, you change the due date and/or original estimation.
1.2Jira Server 4.0 - 4.2.42010-10-24display of issue's completion% and milestones - Updated and tested for current Jira version 4.2
- display of due dates as additional information on the left hand side of the Gantt view
- display of complete% (work logging) and remaining effort estimations when exceeding original estimation
- dark blue part of task bar to display the progress of efforts in %
- yellow background of task bar,
if logged work + remaining estimation > original estimation
(display "~x%" with x > 100 for information purposes on the right top side)
- red task bar, if logged work > original estimation
(display "x%" effort with x > 100 for information purposes in yellow on the left side within the task bar) - display of milestones
(Takes the planned start date, if new custom field 'Gantt' has been checked for 'Milestone'. Currently, no validation are build in to check due date etc.)
1.1Jira Server 4.0 - 4.1.22010-10-12handling of multi-level sub-issues - Sub-issues of all issues, fitting into the selected time box, are displayed directly below their parent.
- A parent issue can be extended or compressed/folded. When it is displayed within one line (compressed mode), all sub-issues are visualized as small bars for an enhanced overview. This has been tested using Firefox as well as Microsoft InternetExplorer. Different browser behaviour and W3C-interpretations are still time-consuming.