CloudJira Cloud2024-04-02Minor version update Minor version update6.16.3Jira Data Center 8.0.0 - 9.15.12024-04-17Maintenance release No release notes.6.16.3Jira Server 8.0.0 - 9.15.12024-04-17Maintenance release No release notes.6.16.2Jira Data Center 8.0.0 - 9.15.12024-04-10Maintenance release Fixed:
- The Velocity chart was displayed without adhering to the basic configuration settings
- The Personal Velocity chart now adheres to any custom "Done" status configurations set by the user
6.16.2Jira Server 8.0.0 - 9.15.12024-04-10Maintenance release Fixed:
- The Velocity chart was displayed without adhering to the basic configuration settings
- The Personal Velocity chart now adheres to any custom "Done" status configurations set by the user
6.16.1Jira Data Center 8.0.0 - 9.15.12024-04-02Fixed missing average line on default charts due to layout changes 6.16.1Jira Server 8.0.0 - 9.15.12024-04-02Fixed missing average line on default charts due to layout changes 6.16.0Jira Data Center 8.0.0 - 9.14.12024-03-18New Burnup chart for Epics - New Burnup chart for Epics
- Highlight the selected Sprint or Interval details in Burnup and Burndown charts
6.16.0Jira Server 8.0.0 - 9.14.12024-03-18New Burnup chart for Epics - New Burnup chart for Epics
- Highlight the selected Sprint or Interval details in Burnup and Burndown charts
6.15.0Jira Data Center 8.0.0 - 9.14.12024-03-11Burnup & Burndown UX improvements + Sprint lazy loading - Added Target Dates to Burnup & Burndown charts
- Introduced chart lazy loading
- Add JQL filter input to Forecast tab for Burnup & Burndown charts
6.15.0Jira Server 8.0.0 - 9.14.12024-03-11Burnup/Burndown UX improvements + Sprint lazy loading - Added Target Dates to Burnup & Burndown charts
- Introduced chart lazy loading
- Add JQL filter input to Forecast tab for Burnup & Burndown charts
6.14.0Jira Data Center 8.0.0 - 9.14.12024-02-28Board sets The process of selecting numerous boards as data sources every time new charts are created becomes cumbersome. To tackle this issue, we introduced the 'Board set' feature. This feature simplifies the aggregation of Sprint and Kanban metrics for large units by enabling the selection of multiple boards as a single data source with just one click, thereby streamlining the chart creation process.
6.14.0Jira Server 8.0.0 - 9.14.12024-02-28Board sets The process of selecting numerous boards as data sources every time new charts are created becomes cumbersome. To tackle this issue, we introduced the 'Board set' feature. This feature simplifies the aggregation of Sprint and Kanban metrics for large units by enabling the selection of multiple boards as a single data source with just one click, thereby streamlining the chart creation process.
6.13.0Jira Data Center 8.0.0 - 9.14.12024-02-20Chart loader and other UX Improvements We’ve made some cosmetic changes to help users navigate through new releases and further plans.
Release includes:
- Chart loader with tips
- 'New' label near the version number for the first seven days after release
- Expanded Help menu with new links
- Rate us button
6.13.0Jira Server 8.0.0 - 9.14.12024-02-20Chart loader and other UX Improvements We’ve made some cosmetic changes to help users navigate through new releases and further plans.
Release includes:
- Chart loader with tips
- 'New' label near the version number for the first seven days after release
- Expanded Help menu with new links
- Rate us button
6.12.1Jira Data Center 8.0.0 - 9.13.12024-02-08Maintenance release No release notes.6.12.1Jira Server 8.0.0 - 9.13.12024-02-08Maintenance release No release notes.6.12.0Jira Data Center 8.0.0 - 9.13.12024-02-08Live Data Link and bugfixes in Sprint Burndown When exporting a CSV file with chart data for use in external tools or data storage, users often want these numbers to be automatically updated. To address this need, we have developed the Live Data Link feature.
Upon request, the link provides access to the same CSV file as the Export feature. This link facilitates automation by allowing users to obtain real-time updates directly from the chart.
This release includes:
- Live Data Link for Cloud
- Fixed in the Sprint Burndown chart, the issues completed outside are counted as completed
6.12.0Jira Server 8.0.0 - 9.13.12024-02-08Live Data Link and bugfixes in Sprint Burndown When exporting a CSV file with chart data for use in external tools or data storage, users often want these numbers to be automatically updated. To address this need, we have developed the Live Data Link feature.
Upon request, the link provides access to the same CSV file as the Export feature. This link facilitates automation by allowing users to obtain real-time updates directly from the chart.
This release includes:
- Live Data Link for Cloud
- Fixed in the Sprint Burndown chart, the issues completed outside are counted as completed
6.11.0Jira Data Center 8.0.0 - 9.13.12024-01-25Duplicate gadget and bugfix When you have a well-configured gadget for one team or scope, you often want to create a similar one with slight modifications. Before version 6.11.0, this required exporting the settings and importing them into a new gadget while the entire Jira dashboard reloaded multiple times. We understand this was not a pleasant experience.
Therefore, starting with version 6.11.0, you can duplicate your gadget to any dashboard with just a few clicks, eliminating any manual work. Simply click on the button and confirm the selection of the target dashboard.
6.11.0Jira Server 8.0.0 - 9.13.12024-01-25Duplicate gadget and bugfix When you have a well-configured gadget for one team or scope, you often want to create a similar one with slight modifications. Before version 6.11.0, this required exporting the settings and importing them into a new gadget while the entire Jira dashboard reloaded multiple times. We understand this was not a pleasant experience.
Therefore, starting with version 6.11.0, you can duplicate your gadget to any dashboard with just a few clicks, eliminating any manual work. Simply click on the button and confirm the selection of the target dashboard.
6.10.0Jira Data Center 8.0.0 - 9.12.72024-01-22Sprint metrics breakdown by Boards in Cross-team Velocity Chart for Scrum Boards When multiple teams collaborate on, e.g., a major release, having sprint metrics segmented by boards (teams) is essential. This allows you to examine individual team data alongside aggregate values, providing insights into anomalies and trends.
We have introduced this feature exclusively for Team/Cross-team Velocity Chart for Scrum Boards.
Based on your feedback, we plan to extend this functionality to additional charts and include more breakdown options. We would greatly value understanding your specific use cases, so please don't hesitate to contact us!
6.10.0Jira Server 8.0.0 - 9.12.72024-01-22Sprint metrics breakdown by Boards in Cross-team Velocity Chart for Scrum Boards When multiple teams collaborate on, e.g., a major release, having sprint metrics segmented by boards (teams) is essential. This allows you to examine individual team data alongside aggregate values, providing insights into anomalies and trends.
We have introduced this feature exclusively for Team/Cross-team Velocity Chart for Scrum Boards.
Based on your feedback, we plan to extend this functionality to additional charts and include more breakdown options. We would greatly value understanding your specific use cases, so please don't hesitate to contact us!
6.9.0Jira Server 8.0.0 - 9.12.72024-01-10Parent field support in Burnup Chart for Initiatives and UX improvements Users of Jira Premium can now create an Issue Hierarchy based on the parent field, which we need to support. Additionally, we have introduced several enhancements to broaden your capabilities.
This release includes:
- Parent field support in Burnup Chart for Initiatives
- Epic filter in Burnup Chart for Initiatives
- Interval Count for sprint grouping by months or quarters
- The average value can be read even with overlaps
6.9.0Jira Data Center 8.0.0 - 9.12.72024-01-10Parent field support in Burnup Chart for Initiatives and UX improvements Users of Jira Premium can now create an Issue Hierarchy based on the parent field, which we need to support. Additionally, we have introduced several enhancements to broaden your capabilities.
This release includes:
- Parent field support in Burnup Chart for Initiatives
- Epic filter in Burnup Chart for Initiatives
- Interval Count for sprint grouping by months or quarters
- The average value can be read even with overlaps
6.8.1Jira Data Center 8.0.0 - 9.12.72023-12-28Maintenance release Fixed crashed reports if more than one scrum board selected in the settings.
6.8.1Jira Server 8.0.0 - 9.12.72023-12-28Maintenance release Fixed crashed reports if more than one scrum board selected in the settings.
6.8.0Jira Data Center 8.0.0 - 9.12.72023-12-28UX Improvements Improvements:- Not finished intervals excluded in forecast calculations based on previous max, min, and average velocity
- Access to settings is available even when the chart is not loaded in reports
- Sprint goals are visible in the “Sprint details” of the chart
- All metrics and essential averages of the Velocity Charts for Scrum
- Boards are enabled by default for all newly created charts
- Added a tooltip to the latest version link
- Added search to the epic dropdown to find any epic without limitation
- Updated UI of the “People” settings tab in the Personal Velocity Chart
Fixes:
- Wrong completed work calculation when choosing more than one status in the custom done statuses field of the Personal Velocity Chart
- Forecast displayed on the chart only after disabling/enabling of the max/min/average labels
6.8.0Jira Server 8.0.0 - 9.12.72023-12-28UX Improvements Improvements:
- Not finished intervals excluded in forecast calculations based on previous max, min, and average velocity
- Access to settings is available even when the chart is not loaded in reports
- Sprint goals are visible in the “Sprint details” of the chart
- All metrics and essential averages of the Velocity Charts for Scrum
- Boards are enabled by default for all newly created charts
- Added a tooltip to the latest version link
- Added search to the epic dropdown to find any epic without limitation
- Updated UI of the “People” settings tab in the Personal Velocity Chart
Fixes:
- Wrong completed work calculation when choosing more than one status in the custom done statuses field of the Personal Velocity Chart
- Forecast displayed on the chart only after disabling/enabling of the max/min/average labels
6.7.1Jira Data Center 8.0.0 - 9.12.72023-12-21Polished the code for a smoother, more reliable experience. Fixed:
- Forecast being drawn from different dates in the report and gadget
- Wrong forecast calculation when the user selected start burnup "today"
- Different forecasts if applying custom what-if-scenario for the automatically calculated min/max/avg values
6.7.1Jira Server 8.0.0 - 9.12.72023-12-21Polished the code for a smoother, more reliable experience. Fixed:
- Forecast being drawn from different dates in the report and gadget
- Wrong forecast calculation when the user selected start burnup "today"
- Different forecasts if applying custom what-if-scenario for the automatically calculated min/max/avg values
6.7.0Jira Data Center 8.0.0 - 9.12.72023-12-18Integrated time-tracking in Personal Velocity Chart for Scrum Boards and bugfix To fully implement this blended approach across all charts, we've also incorporated the merger of two types of data — time spent and time remaining — into the Personal Velocity Chart. Utilizing the “Time Spent & Remaining Time” field as an Estimation field allows for comprehensive tracking of a team member’s contributions. This tracking includes their involvement in issues before being unassigned during the sprint, as well as their impact on issues that remain assigned to them after the sprint’s end date.
This release includes:
- Integrated "Time Spent & Remaining Time" Estimation Field in Personal Velocity Chart for Scrum Boards
- Fixed the absence of a message when your license expires
- Fixed that wrong ticket status shown on the chart for tickets with a long history of change logs
6.7.0Jira Server 8.0.0 - 9.12.72023-12-18Integrated time-tracking in Personal Velocity Chart for Scrum Boards and bugfix To fully implement this blended approach across all charts, we've also incorporated the merger of two types of data — time spent and time remaining — into the Personal Velocity Chart. Utilizing the “Time Spent & Remaining Time” field as an Estimation field allows for comprehensive tracking of a team member’s contributions. This tracking includes their involvement in issues before being unassigned during the sprint, as well as their impact on issues that remain assigned to them after the sprint’s end date.
This release includes:
- Integrated "Time Spent & Remaining Time" Estimation Field in Personal Velocity Chart for Scrum Boards
- Fixed the absence of a message when your license expires
- Fixed that wrong ticket status shown on the chart for tickets with a long history of change logs
6.6.0Jira Data Center 8.0.0 - 9.12.72023-12-06New Team/Cross-team Burnup Chart for Initiatives or any entity above the Epic In a Scaled Agile environment, the Jira process needs structuring with complex hierarchies beyond standard offerings. Enterprises adapt by renaming and creating new issue and link types, building an issue architecture above the basic Epic-Story-Sub-task structure.
Adjustments typically involve creating “boxes” for the Program level and “boxes of boxes” for the Portfolio level. Medium-sized businesses may use just one level above the Epic.
In response to many requests to support such structures, we’ve created a new Burnup Chart, which can use any “box” above the Epic level as a data source. To create a chart for a particular scope, you can select the top-level issue for tracking, set the issue level in the hierarchy, and specify the link type to exclude irrelevant links (e.g., “blocked by”)
This release includes:
- New Team/Cross-team Burnup Chart for Initiatives
- The “New” category in Catalog
6.6.0Jira Server 8.0.0 - 9.12.72023-12-06New Team/Cross-team Burnup Chart for Initiatives or any entity above the Epic In a Scaled Agile environment, the Jira process needs structuring with complex hierarchies beyond standard offerings. Enterprises adapt by renaming and creating new issue and link types, building an issue architecture above the basic Epic-Story-Sub-task structure.
Adjustments typically involve creating “boxes” for the Program level and “boxes of boxes” for the Portfolio level. Medium-sized businesses may use just one level above the Epic.
In response to many requests to support such structures, we’ve created a new Burnup Chart, which can use any “box” above the Epic level as a data source. To create a chart for a particular scope, you can select the top-level issue for tracking, set the issue level in the hierarchy, and specify the link type to exclude irrelevant links (e.g., “blocked by”)
This release includes:
- New Team/Cross-team Burnup Chart for Initiatives
- The “New” category in Catalog
6.5.1Jira Data Center 8.0.0 - 9.12.72023-11-21Bug fixes Fixed:
- chart crashes if the sprint contains the issue created after the previous sprint finished
- Sprint Burndown shows a negative Completed Work value
6.5.1Jira Server 8.0.0 - 9.12.72023-11-21Bug fixes Fixed:
- chart crashes if the sprint contains the issue created after the previous sprint finished
- Sprint Burndown shows a negative Completed Work value
6.5.0Jira Data Center 8.0.0 - 9.11.32023-11-20Integrated time-tracking estimation in Kanban and JQL filter charts Integrating Time Spent and Remaining Time gives teams a more nuanced view of workflow, ensuring a smoother transition to Story Points and more accurate forecasting. This release includes a new integrated "Time Spent & Remaining Time" estimation field option for the following charts:
- Team/Cross-team Velocity Chart for Kanban Boards
- Team/Cross-team Burnup Chart for JQL filters
- Team/Cross-team Velocity Chart for JQL filters
- Team/Cross-team Burnup Chart for Kanban Boards
- Team Sprint Burndown Chart
Fixed:
- Charts crash after migration to the new Agile Reports gadget
- Charts are not loaded if the JQL filter with a multi-select custom field is applied
- "Moving average" is incorrect if the number of sprints in the selected average type is bigger than the number of sprints shown on the chart
6.5.0Jira Server 8.0.0 - 9.11.32023-11-20Integrated time-tracking estimation in Kanban and JQL filter charts Integrating Time Spent and Remaining Time gives teams a more nuanced view of workflow, ensuring a smoother transition to Story Points and more accurate forecasting. This release includes a new integrated "Time Spent & Remaining Time" estimation field option for the following charts:
- Team/Cross-team Velocity Chart for Kanban Boards
- Team/Cross-team Burnup Chart for JQL filters
- Team/Cross-team Velocity Chart for JQL filters
- Team/Cross-team Burnup Chart for Kanban Boards
- Team Sprint Burndown Chart
Fixed:
- Charts crash after migration to the new Agile Reports gadget
- Charts are not loaded if the JQL filter with a multi-select custom field is applied
- "Moving average" is incorrect if the number of sprints in the selected average type is bigger than the number of sprints shown on the chart
6.4.0Jira Data Center 8.0.0 - 9.11.32023-11-09Integrated time-tracking in Velocity, Burnup, Burndown Charts for Scrum Boards Agile Coaches and Scrum Masters are steering their teams through an agile transformation, intending to shift from concrete time measurements to the more fluid concept of Story Points. They're looking to do this in a way that feels natural to the team by drawing on their well-honed abilities to estimate and adjust the time they spend on tasks.
Integrating Time Spent and Remaining Time gives teams a more nuanced view of workflow close to Story Points, ensuring a smoother transition and more accurate forecasting.
This release includes:
- Integrated "Time Spent & Remaining Time" Estimation Field in Velocity, Burnup, and Burndown Charts for Scrum Boards
- Fixed that Average values not exporting to CSV file
- Fixed the absence of dashboards in the list during the migration if the user has more than 100 dashboards on the instance
- Limited to 200 maximum unreleased versions that are loading for validation on the chart view
6.4.0Jira Server 8.0.0 - 9.11.32023-11-09Integrated time-tracking in Velocity, Burnup, Burndown Charts for Scrum Boards Agile Coaches and Scrum Masters are steering their teams through an agile transformation, intending to shift from concrete time measurements to the more fluid concept of Story Points. They're looking to do this in a way that feels natural to the team by drawing on their well-honed abilities to estimate and adjust the time they spend on tasks.
Integrating Time Spent and Remaining Time gives teams a more nuanced view of workflow close to Story Points, ensuring a smoother transition and more accurate forecasting.
This release includes:
- Integrated "Time Spent & Remaining Time" Estimation Field in Velocity, Burnup, and Burndown Charts for Scrum Boards
- Fixed that Average values not exporting to CSV file
- Fixed the absence of dashboards in the list during the migration if the user has more than 100 dashboards on the instance
- Limited to 200 maximum unreleased versions that are loading for validation on the chart view
6.3.1Jira Data Center 8.0.0 - 9.11.32023-10-30Maintenance release In version 6.3.0, we enabled choosing released versions from boards, which caused endless loading and missing chart data. We've rolled back to the old method where only unreleased versions are selectable from the Release dropdown.
To track released versions, try these:
- If a chart was made before a version's release, it'll work unless you change the version in its settings.
- To monitor a particular released version, use the JQL filter in the Issues tab
6.3.1Jira Server 8.0.0 - 9.11.32023-10-30Maintenance release In version 6.3.0, we enabled choosing released versions from boards, which caused endless loading and missing chart data. We've rolled back to the old method where only unreleased versions are selectable from the Release dropdown.
To track released versions, try these:
- If a chart was made before a version's release, it'll work unless you change the version in its settings.
- To monitor a particular released version, use the JQL filter in the Issues tab
6.3.0Jira Data Center 8.0.0 - 9.11.32023-10-26Configuration button in the toolbar; Past releases selection Now, instead of diving into the edit mode or searching through the chart context menu, just tap on the icon button right from the toolbar.
From version 6.3.0 onwards, you can dive into previous releases to see how things have evolved. It's always good to learn from the past!
Release includes:
- Configuration button in the toolbar
- Past releases selection
- Switching off the active sprint by default
6.3.0Jira Server 8.0.0 - 9.11.32023-10-26Configuration button in the toolbar; Past releases selection Now, instead of diving into the edit mode or searching through the chart context menu, just tap on the icon button right from the toolbar.
From version 6.3.0 onwards, you can dive into previous releases to see how things have evolved. It's always good to learn from the past!
Release includes:
- Configuration button in the toolbar
- Past releases selection
- Switching off the active sprint by default
6.2.0Jira Server 8.0.0 - 9.11.32023-10-20Added custom Assignee field to Personal Velocity chart New features:
- Enhanced the Personal Velocity chart with a custom Assignee field configuration
- Velocity and Burnup charts for JQL filters now have a custom Done status configuration
Fixed:
- The closed sprint showed "end date" instead of the actual "complete" date of the sprint
6.2.0Jira Data Center 8.0.0 - 9.11.32023-10-20Added custom Assignee field to Personal Velocity chart New features:
- Enhanced the Personal Velocity chart with a custom Assignee field configuration
- Velocity and Burnup charts for JQL filters now have a custom Done status configuration
Fixed:
- The closed sprint showed "end date" instead of the actual "complete" date of the sprint
6.1.0Jira Data Center 8.0.0 - 9.11.32023-10-17Dark Theme, Burnup/Burndown charts upgrade, Sharing report to the Jira Dashboard We've established Dark theme support to align with Jira UI capabilities. Now, using our app is a bit safer for your eyes :)
Since this version, you can create Burnup/Burndown charts across several Scrum Boards and track common Epics or Releases.
Last but not least, we've enhanced creating a gadget on the Jira Dashboard with the same settings as the report, so you don't need to export and import settings manually.
This release includes:
- Dark theme support
- Team Burnup and Burndown Charts for Scrum Boards upgraded to Team/Cross-Team
- Ability to add a report as a gadget to the Jira Dashboard
- Improved error handling in Confluence
6.1.0Jira Server 8.0.0 - 9.11.32023-10-17Dark Theme, Burnup/Burndown charts upgrade, Sharing report to the Jira Dashboard We've established Dark theme support to align with Jira UI capabilities. Now, using our app is a bit safer for your eyes :)
Since this version, you can create Burnup/Burndown charts across several Scrum Boards and track common Epics or Releases.
Last but not least, we've enhanced creating a gadget on the Jira Dashboard with the same settings as the report, so you don't need to export and import settings manually.
This release includes:
- Dark theme support
- Team Burnup and Burndown Charts for Scrum Boards upgraded to Team/Cross-Team
- Ability to add a report as a gadget to the Jira Dashboard
- Improved error handling in Confluence
6.0.1Jira Data Center 8.0.0 - 9.11.32023-09-26Add max sprint count setting in the Global Settings for Personal Velocity Chart. No release notes.6.0.1Jira Server 8.0.0 - 9.11.32023-09-26Add max sprint count setting in the Global Settings for Personal Velocity Chart. No release notes.6.0.0Jira Data Center 8.0.0 - 9.11.32023-09-21User Onboarding, Chart Catalog, and many more We've overhauled our chart collection, gadgets, chart settings, and technical architecture to create a completely functional Chart Catalog. Now, both our existing users and newcomers can easily browse the necessary charts and engage with us as assistants for advanced configuration.This release includes:
- Reports and Gadgets revision
- Report UI updates
- Settings updates
- Getting started page
- Chart Catalog
- Create gadget from Catalog
- My Reports button in projects
- Tutorials
- Latest version notification
6.0.0Jira Server 8.0.0 - 9.11.32023-09-21User Onboarding, Chart Catalog, and many more We've overhauled our chart collection, gadgets, chart settings, and technical architecture to create a completely functional Chart Catalog. Now, both our existing users and newcomers can easily browse the necessary charts and engage with us as assistants for advanced configuration.This release includes:
- Reports and Gadgets revision
- Report UI updates
- Settings updates
- Getting started page
- Chart Catalog
- Create gadget from Catalog
- My Reports button in projects
- Tutorials
- Latest version notification
5.4.1Jira Data Center 8.0.0 - 9.11.32023-09-06Fixed failing cross-team report No release notes.5.4.1Jira Server 8.0.0 - 9.11.32023-09-06Fixed failing cross-team report No release notes.5.4.0Jira Data Center 8.0.0 - 9.11.32023-09-04Maintenance release Improvements:- The percentage value of the "Not completed work" based on the "Final commitment"
- Now, user preferences are enabled for all gadgets in Confluence
5.4.0Jira Server 8.0.0 - 9.11.32023-09-04Maintenance release Improvements:
- The percentage value of the "Not completed work" based on the "Final commitment"
- Now, user preferences are enabled for all gadgets in Confluence
5.3.11Jira Data Center 8.0.0 - 9.10.22023-08-16Maintenance release Fixed:
- Metrics values in 'active sprint' were not being rounded correctly
- The chart crash after executing specific JQL filter
5.3.11Jira Server 8.0.0 - 9.10.22023-08-16Maintenance release Fixed:
- Metrics values in 'active sprint' were not being rounded correctly
- The chart crash after executing specific JQL filter
5.3.10Jira Data Center 8.0.0 - 9.10.22023-08-09Maintenance release Fixed chart settings migration during an update to the latest version from an app version 3.5.16 and older
5.3.10Jira Server 8.0.0 - 9.10.22023-08-09Maintenance release Fixed chart settings migration during an update to the latest version from an app version 3.5.16 and older
5.3.9Jira Data Center 8.0.0 - 9.10.22023-08-04Maintenance release No release notes.5.3.9Jira Server 8.0.0 - 9.10.22023-08-04Maintenance release No release notes.5.3.7Jira Data Center 8.0.0 - 9.10.22023-08-02Maintenance release - Fixed the recent reports' broken link
- Added pagination to the saved JQL filter selector
5.3.7Jira Server 8.0.0 - 9.10.22023-08-02Maintenance release - Fixed the recent reports' broken link
- Added pagination to the saved JQL filter selector
5.3.5Jira Data Center 8.0.0 - 9.10.22023-07-26Maintenance release No release notes.5.3.5Jira Server 8.0.0 - 9.10.22023-07-26Maintenance release No release notes.5.3.4Jira Data Center 8.0.0 - 9.10.22023-07-20Maintenance release Fixed the Velocity chart does not show re-assignee for a ticket in the active sprint
5.3.4Jira Server 8.0.0 - 9.10.22023-07-20Maintenance release Fixed the Velocity chart does not show re-assignee for a ticket in the active sprint
5.3.2Jira Data Center 8.0.0 - 9.9.22023-07-05Maintenance release Fixed issue with JQL filter type for Business charts
5.3.2Jira Server 8.0.0 - 9.9.22023-07-05Maintenance release Fixed issue with JQL filter type for Business charts
5.3.0Jira Data Center 8.0.0 - 9.9.22023-06-19Bug fixes Fixed:
- "Completed Outside" metric not moving to "Completed" after issue was reopened
- metrics are not displayed in charts with an Epic filter selected
Please see the release notes.
5.3.0Jira Server 8.0.0 - 9.9.22023-06-19Bug fixes Fixed:
- "Completed Outside" metric not moving to "Completed" after issue was reopened
- metrics are not displayed in charts with an Epic filter selected
Please see the release notes.
5.2.7Jira Data Center 8.0.0 - 9.9.22023-06-12Maintenance release Fixed the Kanban Team Velocity is not showing Assignees in the charts
5.2.7Jira Server 8.0.0 - 9.9.22023-06-12Maintenance release Fixed the Kanban Team Velocity is not showing Assignees in the charts
5.2.6Jira Data Center 8.0.0 - 9.9.22023-06-05Maintenance release Updated Atlassian-related dependencies to the latest versions.
5.2.6Jira Server 8.0.0 - 9.9.22023-06-05Maintenance release Updated Atlassian-related dependencies to the latest versions.
5.2.4Jira Data Center 8.0.0 - 9.8.22023-05-26Maintenance release Performance improvement for Business Team Velocity and Business Team Burnup charts
5.2.4Jira Server 8.0.0 - 9.8.22023-05-26Maintenance release Performance improvement for Business Team Velocity and Business Team Burnup charts
5.2.3Jira Data Center 8.0.0 - 9.8.22023-05-25Maintenance release Fixed the issue with cache state replication across Jira nodes for invalidation operations
5.2.3Jira Server 8.0.0 - 9.8.22023-05-25Maintenance release Fixed the issue with cache state replication across Jira nodes for invalidation operations
5.2.2Jira Data Center 8.0.0 - 9.8.22023-05-19Maintenance release Fixed:
- incorrect metrics calculation for completed work (initial) when estimation changes
- 403 error appearing inserting a macro into a Confluence page
5.2.2Jira Server 8.0.0 - 9.8.22023-05-19Maintenance release Fixed incorrect metrics calculation for completed work (initial) when estimation changes
5.2.1Jira Data Center 8.0.0 - 9.8.22023-05-15Maintenance release Fixed wrong user names labels on Personal Velocity Chart
5.2.1Jira Server 8.0.0 - 9.8.22023-05-15Maintenance release Fixed wrong user names labels on Personal Velocity Chart
5.2.0Jira Data Center 8.0.0 - 9.8.22023-05-11Custom estimation field for particular Scrum Board in Cross-team Velocity Chart New feature:
- Custom estimation field for particular Scrum Board in Cross-team Velocity Chart
Bug fix:
- Issues show unassigned as assignee in Velocity Chart for Kanban team
5.2.0Jira Server 8.0.0 - 9.8.22023-05-11Custom estimation field for particular Scrum Board in Cross-team Velocity Chart New feature:
- Custom estimation field for particular Scrum Board in Cross-team Velocity Chart
Bug fix:
- Issues show unassigned as assignee in Velocity Chart for Kanban team
5.1.0Jira Data Center 8.0.0 - 9.8.22023-05-05Performance improvements New feature:- Enable / Disable cache
Fixed:
- Gadget crashing with only one interval at the report
5.1.0Jira Server 8.0.0 - 9.8.22023-05-05Performance improvements New feature:
- Enable / Disable cache
Fixed:
- Gadget crashing with only one interval at the report
5.0.0Jira Data Center 8.0.0 - 9.8.22023-04-28Major release 5.0 with new reports and gadgets - New charts: Scrum Cross-team Velocity Chart, Scrum Personal Velocity Chart
- New features in Scrum Team Velocity Chart: default estimation, percentage base, custom Done statuses, group sprints
5.0.0Jira Server 8.0.0 - 9.8.22023-04-28Major release 5.0 with new reports and gadgets - New charts: Scrum Cross-team Velocity Chart, Scrum Personal Velocity Chart
- New features in Scrum Team Velocity Chart: default estimation, percentage base, custom Done statuses, group sprints
4.1.0Jira Server 8.0.0 - 9.8.22023-04-19Performance improvements The user can see charts faster.
4.1.0Jira Data Center 8.0.0 - 9.8.22023-04-19Performance improvements The user can see charts faster.
4.0.1Jira Server 8.0.0 - 9.7.22023-04-07Maintenance release Improvements:
- Polished mechanic for custom JQL auto-suggestions
- Changed rounding of estimation values to 2 digits
4.0.1Jira Data Center 8.0.0 - 9.7.22023-04-07Maintenance release Improvements:
- Polished mechanic for custom JQL auto-suggestions
- Changed rounding of estimation values to 2 digits
4.0.0Jira Data Center 8.0.0 - 9.7.22023-03-28Major release 4.0 with new features and improved UI/UX New major features:
- Improved UI/UX - analyse the reports more efficiently
- User Preferences - customise the metrics that you want to see on the chart without affecting the chart’s look and feel for other users
4.0.0Jira Server 8.0.0 - 9.7.22023-03-28Major release 4.0 with new features and improved UI/UX New major features:
- Improved UI/UX - analyse the reports more efficiently
- User Preferences - customise the metrics that you want to see on the chart without affecting the chart’s look and feel for other users
3.15.8Jira Server 8.0.0 - 9.6.02023-03-20Maintenance release Fixed:
- Done issues duplicate in intervals
- Not all resolved issues are included in the chart
3.15.8Jira Data Center 8.0.0 - 9.6.02023-03-20Maintenance release Fixed:- Done issues duplicate in intervals
- Not all resolved issues are included in the chart
3.15.7Jira Data Center 8.0.0 - 9.6.02023-02-10Maintenance release Fixed:- Some sprint tickets are not displayed on the charts
3.15.7Jira Server 8.0.0 - 9.6.02023-02-10Maintenance release 3.15.6Jira Server 8.0.0 - 9.6.02023-02-06Maintenance release Fixes:
- Epic field is reset when the settings menu is opened in Burnup & Burndown charts
- Not all resolved resolved issues are included to the Universal\Business Velocity Chart
- Request header too long issue
Improvements:
- New branding logos
- Export files content cleanup
3.15.6Jira Data Center 8.0.0 - 9.6.02023-02-06Maintenance release Fixes:- Epic field is reset when the settings menu is opened in Burnup & Burndown charts
- Not all resolved resolved issues are included to the Universal\Business Velocity Chart
- Request header too long issue
Improvements:
- New branding logos
- Export files content cleanup
3.15.4Jira Data Center 8.0.0 - 9.5.12022-12-08Maintenance release Fixed:- Gadget getting error during loading Business Team BurnUp Chart
3.15.4Jira Server 8.0.0 - 9.5.12022-12-08Maintenance release Fixed:
- Gadget getting error during loading Business Team BurnUp Chart
3.15.2Jira Data Center 8.0.0 - 9.5.12022-11-11Maintenance release - Increased page loading speed
- Fixed Team Velocity Chart error
3.15.2Jira Server 8.0.0 - 9.5.12022-11-11Maintenance release Increased page loading speed
3.15.3Jira Data Center 8.0.0 - 9.4.202022-11-30Maintenance release - Set up future sprints to show how many points are planned
3.15.3Jira Server 8.0.0 - 9.4.202022-11-30Maintenance release - Set up future sprints to show how many points are planned
3.15.0Jira Data Center 8.0.0 - 9.3.32022-11-01New features and improvements In this release we have added the following features and improvements:
- Add the ability to switch to the gadget configuration while the view data is loading
- Changed "Grouping period" cutting to Monday in option "Start date" for Burnup gadgets to start from the current day of the week
- Add setting to specify constant Y-axis height for percentage-based charts
- Consolidate validation notifications look and feel for gadget settings forms
- Fixed "Estimation field" not saving for gadgets
- Fixed disappearing values of "Sprint" after reload page for Sprint Burndown gadgets
3.15.0Jira Server 8.0.0 - 9.3.32022-11-01New features and improvements In this release we have added the following features and improvements:
- Add the ability to switch to the gadget configuration while the view data is loading
- Changed "Grouping period" cutting to Monday in option "Start date" for Burnup gadgets to start from the current day of the week
- Add setting to specify constant Y-axis height for percentage-based charts
- Consolidate validation notifications look and feel for gadget settings forms
- Fixed "Estimation field" not saving for gadgets
- Fixed disappearing values of "Sprint" after reload page for Sprint Burndown gadgets
3.14.0Jira Data Center 7.2.0 - 9.3.32022-09-28User friendly maintenance screen and other improvements - Calculations of a min velocity & completion date ignores zero velocity
- 'Weekly' grouping option for custom period starts from current weekday
- Minor UI/UIX improvements
- Fixed cropped date picker
- Fixed custom issue type icons size to match a built-in one
3.14.0Jira Server 7.2.0 - 9.3.32022-09-28User friendly maintenance screen and other improvements - Calculations of a min velocity & completion date ignores zero velocity
- 'Weekly' grouping option for custom period starts from current weekday
- Minor UI/UIX improvements
- Fixed cropped date picker
- Fixed custom issue type icons size to match a built-in one
3.13.0Jira Data Center 7.2.0 - 9.2.12022-08-18Import/export gadget settings on a project basis New feature:
- Import/export gadget settings on a project basis
Fixed:
- Gadget Universal Burnup date picker positioning
- Renamed "Completed work" to "Remaining work" in Release Burndown Chart
- View interval issues in Kanban Team Velocity
3.13.0Jira Server 7.2.0 - 9.2.12022-08-18Import/export gadget settings on a project basis New feature:
- Import/export gadget settings on a project basis
Fixed:
- Gadget Universal Burnup date picker positioning
- Renamed "Completed work" to "Remaining work" in Release Burndown Chart
- View interval issues in Kanban Team Velocity
3.12.0Jira Data Center 7.2.0 - 9.1.12022-07-29Jira 9 support No release notes.3.12.0Jira Server 7.2.0 - 9.1.12022-07-29Jira 9 support No release notes.3.11.8Jira Data Center 7.2.0 - 8.25.22022-07-08Bug fixes Fixed:
- PARG-17 Kanban reports - weekly intervals starting dates are shifted over time or when different reporting intervals are defined
3.11.8Jira Server 7.2.0 - 8.25.22022-07-08Bug fixes Fixed:
- PARG-17 Kanban reports - weekly intervals starting dates are shifted over time or when different reporting intervals are defined
3.11.7Jira Data Center 7.2.0 - 8.25.22022-06-24Bug fixes Fixed:
- PARG-15 Date picker is cropped in sprint settings for all gadgets
3.11.7Jira Server 7.2.0 - 8.25.22022-06-24Bug fixes Fixed:
- PARG-15 Date picker is cropped in sprint settings for all gadgets
3.11.5Jira Data Center 7.2.0 - 8.25.22022-05-22Security fix - stored XSS through report name This release contains a security fix for stored XSS through report name
3.11.5Jira Server 7.2.0 - 8.25.22022-05-22Security fix - stored XSS through report name This release contains a security fix for stored XSS through report name
3.11.4Jira Data Center 7.2.0 - 8.25.22022-05-21Long-awaited bug fixes Fixed:
- PARG-13 Long issue key is truncated in sprint issues list
- PARG-12 Filtering by Epic link doesn't work in Jira Cloud Team Managed projects
- PARG-11 In Velocity Chart initial commitment/completed work contains issues completed outside of the sprint
- PARG-10 Sprint burndown date labels are duplicated and offset date is calculated incorrectly due to incorrect Time zone handling
- PARG-9 Agile Gadgets are not loaded in Confluence
- PARG-8 Unable to export PNG from gadgets from Jira Dashboard
- PARG-6 Empty issue status category causes an exception
- PARG-4 Burndown Report Dates are incorrect
- PARG-3 Empty issue status category causes an exception
- PARG-2 Unable to export PNG from the Velocity Chart gadget within a Jira Dashboard
- PARG-1 In Scrum team velocity chart sprint metrics values sometimes are not rounded correctly
Added:
- PARG-5 User can change line color for automatically calculated velocity in burnup charts.
3.11.4Jira Server 7.2.0 - 8.25.22022-05-21Long-awaited bug fixes Fixed:
- PARG-13 Long issue key is truncated in sprint issues list
- PARG-12 Filtering by Epic link doesn't work in Jira Cloud Team Managed projects
- PARG-11 In Velocity Chart initial commitment/completed work contains issues completed outside of the sprint
- PARG-10 Sprint burndown date labels are duplicated and offset date is calculated incorrectly due to incorrect Time zone handling
- PARG-9 Agile Gadgets are not loaded in Confluence
- PARG-8 Unable to export PNG from gadgets from Jira Dashboard
- PARG-6 Empty issue status category causes an exception
- PARG-4 Burndown Report Dates are incorrect
- PARG-3 Empty issue status category causes an exception
- PARG-2 Unable to export PNG from the Velocity Chart gadget within a Jira Dashboard
- PARG-1 In Scrum team velocity chart sprint metrics values sometimes are not rounded correctly
Added:
- PARG-5 User can change line color for automatically calculated velocity in burnup charts.
3.11.2Jira Data Center 7.2.0 - 8.22.62021-12-13Fix Business team velocity gadget settings failure 🇺🇦🇺🇦Broken Build, the Ukrainian company, stops support and blocks apps and sales for clients from Russia and Belarus in response to their aggression against Ukraine🇺🇦🇺🇦
3.11.2Jira Server 7.2.0 - 8.22.62021-12-13Fix Business team velocity gadget settings failure 🇺🇦🇺🇦Broken Build, the Ukrainian company, stops support and blocks apps and sales for clients from Russia and Belarus in response to their aggression against Ukraine🇺🇦🇺🇦
3.11.1Jira Data Center 7.2.0 - 8.21.12021-12-11Bug fixes Fixed:
- Export reports to CSV/PDF doesn't work
3.11.1Jira Server 7.2.0 - 8.21.12021-12-11Bug fixes Fixed:
- Export reports to CSV/PDF doesn't work
3.10.1Jira Data Center 7.2.0 - 8.20.302021-11-02New option to include future sprints into Scrum Team Velocity chart No release notes.3.10.1Jira Server 7.2.0 - 8.20.302021-11-02New option to include future sprints into Scrum Team Velocity chart No release notes.3.9.4Jira Data Center 7.2.0 - 8.20.302021-10-21Show app version info in footer of gadgets and reports No release notes.3.9.4Jira Server 7.2.0 - 8.20.302021-10-21Show app version info in footer of gadgets and reports No release notes.3.9.3Jira Data Center 7.2.0 - 8.20.302021-10-19Bug fixes and improvements - [FIXED] Completed work (initial) sprint metric value is displayed in seconds instead of hours/days
- [ADDED] CSV export includes sprint metrics average values
3.9.3Jira Server 7.2.0 - 8.20.302021-10-19Bug fixes and improvements - [FIXED] Completed work (initial) sprint metric value is displayed in seconds instead of hours/days
- [ADDED] CSV export includes sprint metrics average values
3.9.2Jira Data Center 7.2.0 - 8.19.12021-10-06Bug fixes for sprint metrics calculation No release notes.3.9.2Jira Server 7.2.0 - 8.19.12021-10-06Bug fixes for sprint metrics calculation No release notes.3.9.1Jira Data Center 7.2.0 - 8.19.12021-10-01Bug fixes Fixed:
- Issue status in sprint details of Scrum Velocity chart must be as of the moment when the sprint was closed
- Incorrect total work in Sprint burndown when estimate statistics is Original estimate
3.9.1Jira Server 7.2.0 - 8.19.12021-10-01Bug fixes Fixed:
- Issue status in sprint details of Scrum Velocity chart must be as of the moment when the sprint was closed
- Incorrect total work in Sprint burndown when estimate statistics is Original estimate
3.9.0Jira Data Center 7.2.0 - 8.19.12021-09-23Sprint burndown improvements No release notes.3.9.0Jira Server 7.2.0 - 8.19.12021-09-23Sprint burndown improvements No release notes.3.8.9Jira Data Center 7.2.0 - 8.19.12021-08-10Round CSV exported metric values to 1 decimal place No release notes.3.8.9Jira Server 7.2.0 - 8.19.12021-08-10Round CSV exported metric values to 1 decimal place No release notes.3.8.8Jira Data Center 7.2.0 - 8.18.22021-06-17Fix sprint metrics calculation No release notes.3.8.8Jira Server 7.2.0 - 8.18.22021-06-17Fix sprint metrics calculation No release notes.3.8.6Jira Data Center 7.2.0 - 8.17.02021-06-07Bug fixes and performance improvements Fixed:
- In Sprint burndown when complete work is set to Aggregate mode Automatic velocities are calculated incorrectly
- In Burnup charts the remaining work value label is not rounded correctly
3.8.6Jira Server 7.2.0 - 8.17.02021-06-07Bug fixes and performance improvements Fixed:
- In Sprint burndown when complete work is set to Aggregate mode Automatic velocities are calculated incorrectly
- In Burnup charts the remaining work value label is not rounded correctly
3.8.4Jira Data Center 7.2.0 - 8.17.02021-04-26Fix switch from Custom JQL to Search filter data source in Business charts No release notes.3.8.4Jira Server 7.2.0 - 8.17.02021-04-26Fix switch from Custom JQL to Search filter data source in Business charts No release notes.3.8.3Jira Data Center 7.2.0 - 8.16.12021-02-25View issue details in burnup charts In this release, we have added the ability to view issues for sprints/intervals/remaining work in all types of burnup charts.
3.8.3Jira Server 7.2.0 - 8.16.12021-02-25View issue details in burnup charts In this release, we have added the ability to view issues for sprints/intervals/remaining work in all types of burnup charts.
3.8.2Jira Data Center 7.2.0 - 8.15.12021-02-09Bug fixes Fixed:
- incorrect stats for time tracking estimation fields
- burnup/burndown reports unknown error
3.8.2Jira Server 7.2.0 - 8.15.12021-02-09Bug fixes Fixed:
- incorrect stats for time tracking estimation fields
- burnup/burndown reports unknown error
3.8.1Jira Data Center 7.2.0 - 8.15.12021-02-02Fix remaining work calculation in Scrum burnup/burndown charts No release notes.3.8.1Jira Server 7.2.0 - 8.15.12021-02-02Fix remaining work calculation in Scrum burnup/burndown charts No release notes.3.8.0Jira Data Center 7.2.0 - 8.15.12021-01-24Performance improvements and bug fixes No release notes.3.8.0Jira Server 7.2.0 - 8.15.12021-01-24Performance improvements and bug fixes No release notes.3.7.2Jira Data Center 7.2.0 - 8.14.12021-01-20Fix single quote encoding in JQL related gadget settings No release notes.3.7.2Jira Server 7.2.0 - 8.14.12021-01-20Fix single quote encoding in JQL related gadget settings No release notes.3.7.0Jira Data Center 7.2.0 - 8.14.12020-10-05Export to PNG and PDF added to all gadgets No release notes.3.7.0Jira Server 7.2.0 - 8.14.12020-10-05Export to PNG and PDF added to all gadgets No release notes.3.6.2Jira Data Center 7.2.0 - 8.12.32020-10-01Bug fix for initial commitment In this release we have fixed an issue with Initial commitment metric calculated as 0
3.6.2Jira Server 7.2.0 - 8.12.32020-10-01Bug fix for initial commitment In this release we have fixed an issue with Initial commitment metric calculated as 0
3.6.1Jira Data Center 7.2.0 - 8.12.32020-09-30Bug fix for share reports No release notes.3.6.1Jira Server 7.2.0 - 8.12.32020-09-30Bug fix for share reports No release notes.3.6.0Jira Data Center 7.2.0 - 8.12.32020-09-23Autocomplete feature for JQL filter No release notes.3.6.0Jira Server 7.2.0 - 8.12.32020-09-23Autocomplete feature for JQL filter No release notes.3.5.4Jira Data Center 7.2.0 - 8.12.32020-08-31Add ability to select active sprints in Sprint burndown settings No release notes.3.5.4Jira Server 7.2.0 - 8.12.32020-08-31Add ability to select active sprints in Sprint burndown settings No release notes.3.5.3Jira Data Center 7.2.0 - 8.12.32020-08-28Fix view sprint issues in Scrum velocity chart No release notes.3.5.3Jira Server 7.2.0 - 8.12.32020-08-28Fix view sprint issues in Scrum velocity chart No release notes.3.5.2Jira Data Center 7.2.0 - 8.11.12020-08-11Burnup error handling improvements No release notes.3.5.2Jira Server 7.2.0 - 8.11.12020-08-11Burnup error handling improvements No release notes.3.5.1Jira Data Center 7.2.0 - 8.11.12020-07-27Fix JQL filter option being ignored in Kanban Charts No release notes.3.5.1Jira Server 7.2.0 - 8.11.12020-07-27Fix JQL filter option being ignored in Kanban Charts No release notes.3.5.0Jira Data Center 7.2.0 - 8.11.12020-06-22Remove deprecated gadgets, improvements and bug fixes In this release we have removed deprecated gadgets:
- Project burnup
- Single epic burnup
Improved:
- new option "Completed work" in Sprint burndown chart to display daily or aggregated completed work (aka burnup)
- hide disabled forecast options in all burnup charts
Fixed:
- velocity chart crash when sprints are sorted by complete date
- incorrect calculation of completion dates for Original Time Estimate in all burnup charts
- fix date picker value removal
3.5.0Jira Server 7.2.0 - 8.11.12020-06-22Remove deprecated gadgets, improvements and bug fixes In this release we have removed deprecated gadgets:
- Project burnup
- Single epic burnup
Improved:
- new option "Completed work" in Sprint burndown chart to display daily or aggregated completed work (aka burnup)
- hide disabled forecast options in all burnup charts
Fixed:
- velocity chart crash when sprints are sorted by complete date
- incorrect calculation of completion dates for Original Time Estimate in all burnup charts
- fix date picker value removal
3.4.3Jira Data Center 7.2.0 - 8.9.12020-04-23Fix "Sprint filter" value encoding in Scrum gadgets No release notes.3.4.3Jira Server 7.2.0 - 8.9.12020-04-23Fix "Sprint filter" value encoding in Scrum gadgets No release notes.3.4.1Jira Data Center 7.2.0 - 8.8.12020-03-29Bug fix for "Not completed work" in Velocity Chart In this release we have fixed an incorrect "Not completed work" sprint metrics calculation when in some cases it was displayed as a negative value.
3.4.1Jira Server 7.2.0 - 8.8.12020-03-29Bug fix for "Not completed work" in Velocity Chart In this release we have fixed an incorrect "Not completed work" sprint metrics calculation when in some cases it was displayed as a negative value.
3.4.0Jira Data Center 7.2.0 - 8.8.12020-03-26View issue details on Scrum, Kanban and Business velocity charts In this release, we have added the ability to view detailed information about issues in a particular sprint or time interval in all types of Velocity reports and gadgets.
3.4.0Jira Server 7.2.0 - 8.8.12020-03-26View issue details on Scrum, Kanban and Business velocity charts In this release, we have added the ability to view detailed information about issues in a particular sprint or time interval in all types of Velocity reports and gadgets.
3.3.1Jira Data Center 7.2.0 - 8.8.12020-03-18Bug fixes and improvements - business team velocity/burnup gadget crash when Custom JQL filter type was selected
- restrict usage of ORDER BY in JQL filter field clause which caused gadget crash
- prevent saving gadget settings during JQL validation being in progress
3.3.1Jira Server 7.2.0 - 8.8.12020-03-18Bug fixes and improvements - business team velocity/burnup gadget crash when Custom JQL filter type was selected
- restrict usage of ORDER BY in JQL filter field clause which caused gadget crash
- prevent saving gadget settings during JQL validation being in progress
3.3.0Jira Data Center 7.2.0 - 8.7.12020-02-26New reports and gadgets, reports for Jira Cloud In this release we have added two new reports and gadgets:
- Release burndown
- Epic burndown
We have also added the complete support of Reports functionality in Jira Cloud.
3.3.0Jira Server 7.2.0 - 8.7.12020-02-26New reports and gadgets, reports for Jira Cloud In this release we have added two new reports and gadgets:
- Release burndown
- Epic burndown
We have also added the complete support of Reports functionality in Jira Cloud.
3.2.3Jira Data Center 7.2.0 - 8.7.12020-02-20Bug fixes Fixed:
- sprint properties not saved and rolled back to defaults in Scrum Team Velocity gadget
- Scrum Team Velocity report crashed when sprint properties were modified
3.2.3Jira Server 7.2.0 - 8.7.12020-02-20Bug fixes Fixed:
- sprint properties not saved and rolled back to defaults in Scrum Team Velocity gadget
- Scrum Team Velocity report crashed when sprint properties were modified
3.2.1Jira Data Center 7.2.0 - 8.7.12020-02-13Bug fixes Fixed:
- User can save gadget settings with incorrect JQL filter value when gadget is added in Confluence
- Kanban burnup gadget crash in some cases
3.2.1Jira Server 7.2.0 - 8.7.12020-02-13Bug fixes Fixed:
- User can save gadget settings with incorrect JQL filter value when gadget is added in Confluence
- Kanban burnup gadget crash in some cases
3.2.0Jira Data Center 7.2.0 - 8.7.12020-01-28Release Burndown and Epic Burndown reports/gadgets In this release we have added two new burndown reports/gadgets:
- Release Burndown
- Epic Burndown
3.2.0Jira Server 7.2.0 - 8.7.12020-01-28Release Burndown and Epic Burndown reports/gadgets In this release we have added two new burndown reports/gadgets:
- Release Burndown
- Epic Burndown
3.1.0Jira Data Center 7.2.0 - 8.6.12020-01-14Remove deprecated burnup gadgets In this release we have removed two deprecated burnup gadgets while the replacements are provided.
3.1.0Jira Server 7.2.0 - 8.6.12020-01-14Remove deprecated burnup gadgets In this release we have removed two deprecated burnup gadgets while the replacements are provided.
3.0.2Jira Data Center 7.2.0 - 8.6.12019-11-28Bug fix for burnup charts In this release we have fixed an issue with incorrect remaining work calculation when stories were added to future sprints
3.0.2Jira Server 7.2.0 - 8.6.12019-11-28Bug fix for burnup charts In this release we have fixed an issue with incorrect remaining work calculation when stories were added to future sprints
3.0.1Jira Data Center 7.2.0 - 8.5.142019-11-21Report bug fixes and improvements - Reports layout improvements
- Fix sprint length calculation in Burnup reports
- Better error handling
3.0.1Jira Server 7.2.0 - 8.5.142019-11-21Report bug fixes and improvements - Reports layout improvements
- Fix sprint length calculation in Burnup reports
- Better error handling
3.0.0Jira Data Center 7.2.0 - 8.5.142019-11-14New reports - rewritten from scratch! This is a major new release where we shipped 9 reports with the following features:
- Reports catalog with reports for Scrum, Kanban & Business teams
- Velocity, Burnup, Burndown reports
- Recently viewed reports
- Save report configuration to access the report results later with one click
- Share reports with your colleagues
- Dashboard Gadgets for all report types
- Built-in Support Widget to get help and answers
Read this blog post for more details.
3.0.0Jira Server 7.2.0 - 8.5.142019-11-14New reports - rewritten from scratch! This is a major new release where we shipped 9 reports with the following features:
- Reports catalog with reports for Scrum, Kanban & Business teams
- Velocity, Burnup, Burndown reports
- Recently viewed reports
- Save report configuration to access the report results later with one click
- Share reports with your colleagues
- Dashboard Gadgets for all report types
- Built-in Support Widget to get help and answers
Read this blog post for more details.
2.2.0Jira Data Center 7.2.0 - 8.5.142019-10-10Performance improvements and bug fixes - improved performance of all scrum team gadgets
- fix rounding of value labels
- add more details into support data to speed up data related customer requests investigation
2.2.0Jira Server 7.2.0 - 8.5.142019-10-10Performance improvements and bug fixes - improved performance of all scrum team gadgets
- fix rounding of value labels
- add more details into support data to speed up data related customer requests investigation
2.1.1Jira Data Center 7.2.0 - 8.5.142019-09-26Performance improvements and memory usage optimisation No release notes.2.1.1Jira Server 7.2.0 - 8.5.142019-09-26Performance improvements and memory usage optimisation No release notes.2.1.0Jira Data Center 7.2.0 - 8.5.142019-09-19Improvements and fixes - Sprint burndown - add Sprint 'auto' option to display the chart to automatically detected active sprint
- Burnup gadgets - display chart from the selected Start date
- All gadgets - add/remove parent tasks with new toggle option
2.1.0Jira Server 7.2.0 - 8.5.142019-09-19Improvements and fixes - Sprint burndown - add Sprint 'auto' option to display the chart to automatically detected active sprint
- Burnup gadgets - display chart from the selected Start date
- All gadgets - add/remove parent tasks with new toggle option
2.0.3Jira Data Center 7.2.0 - 8.5.142019-09-10Bug fixes and improvements for Sprint Burndown gadget - Sprint Burndown calculation fixes
- Show completed sprints in Sprint Burndown sprint selector
2.0.3Jira Server 7.2.0 - 8.5.142019-09-10Bug fixes and improvements for Sprint Burndown gadget - Sprint Burndown calculation fixes
- Show completed sprints in Sprint Burndown sprint selector
2.0.1Jira Data Center 7.2.0 - 8.3.99999992019-09-03Velocity, burnup, burndown gadgets for Scrum, Kanban and Business teams In this version we have added 7 new gadgets:
- Scrum Team Velocity Chart
- Scrum Team Burnup Chart
- Kanban Team Velocity Chart
- Kanban Team Burnup Chart
- Universal Velocity Chart
- Universal Burnup Chart
- Sprint Burndown Chart
The following older gadgets are now deprecated and will be removed in the next major release v3.0:
- Project burnup gadget
- Epic burnup gadget
- Release burndown gadget
The new gadgets extend and cover deprecated gadgets.
2.0.1Jira Server 7.2.0 - 8.3.99999992019-09-03Velocity, burnup, burndown gadgets for Scrum, Kanban and Business teams In this version we have added 7 new gadgets:
- Scrum Team Velocity Chart
- Scrum Team Burnup Chart
- Kanban Team Velocity Chart
- Kanban Team Burnup Chart
- Universal Velocity Chart
- Universal Burnup Chart
- Sprint Burndown Chart
The following older gadgets are now deprecated and will be removed in the next major release v3.0:
- Project burnup gadget
- Epic burnup gadget
- Release burndown gadget
The new gadgets extend and cover deprecated gadgets.
1.10.1Jira Data Center 7.2.0 - 8.3.52019-06-17Improvements and bug fixes Improvements
- Show project key in version name of Release burndown gadget when versions from multiple projects are available
Fixes:
- Edit gadget menu item is displayed only for users with dashboard edit permission
1.10.1Jira Server 7.2.0 - 8.3.52019-06-17Improvements and bug fixes Improvements
- Show project key in version name of Release burndown gadget when versions from multiple projects are available
Fixes:
- Edit gadget menu item is displayed only for users with dashboard edit permission
1.10.0Jira Data Center 7.2.0 - 8.2.62019-02-13Jira 8 compatibility No release notes.1.10.0Jira Server 7.2.0 - 8.2.62019-02-13Jira 8 compatibility No release notes.1.9.0Jira Data Center 7.0.0 - 7.13.182019-01-17All reports are added to project reports section No release notes.1.9.0Jira Server 7.0.0 - 7.13.182019-01-17All reports are added to project reports section No release notes.1.8.1Jira Data Center 7.0.0 - 7.13.182019-01-06Improvements and bug fixes No release notes.1.8.1Jira Server 7.0.0 - 7.13.182019-01-06Improvements and bug fixes No release notes.1.8.0Jira Data Center 7.0.0 - 7.13.182018-12-14Data Center compatibility No release notes.1.8.0Jira Server 7.0.0 - 7.13.182018-12-14Data Center compatibility No release notes.1.7.6Jira Server 7.0.0 - 7.13.182018-07-26Fix for incorrect warning message in Release Burndown gadget No release notes.1.7.5Jira Server 7.0.0 - 7.11.22018-06-21Bug fix for Project Burnup gadget rendering in Confluence No release notes.1.7.4Jira Server 7.0.0 - 7.10.22018-05-25Bug fix for remaining work calculation in project burnup No release notes.1.7.3Jira Server 7.0.0 - 7.9.22018-05-07IE11 compatibility fix No release notes.1.7.2Jira Server 7.0.0 - 7.9.22018-03-12Fix gadgets flickering caused by infinite resize in Firefox No release notes.1.7.1Jira Server 7.0.0 - 7.8.42018-01-27New configuration options for release burndown gadget It is now possible to choose between hours or days for work estimate in release burndown gadget based on agile board with time estimate statistics.
1.7.0Jira Server 7.0.0 - 7.7.42018-01-12Epic burnup chart improvements In this release we have finalized the complete refactoring of all burnup charts:
- Release burnup report and gadget is now called Project burnup which better reflects its nature
- Epic burnup now works for a single epic which causes a breaking change to Epic burnup gagdet. You will need to configure previously created Epic burnup gadgets and specify a particular epic.
- All gadgets contain a 'Support' screen with support data to get vendor support easier and faster
You can find more details about new features of project and epic burnup charts in our blog.
1.6.0Jira Server 7.0.0 - 7.6.172018-01-02Welcome back to release burndown gadget Release burndown gadget rewritten from scratch
1.5.0Jira Server 7.0.0 - 7.6.172017-12-25Burnup chart improvements Add multiple custom velocity values to get completion forecast for each of them
1.4.3Jira Server 7.0.0 - 7.6.172017-10-01Bug fixes In this release we have fixed an issue with release burnup report when epic issue type is renamed and consists of several words
1.4.2.jira7Jira Server 7.0.0 - 7.5.42016-03-23Jira 7.1 compatibility Version 1.4.2.jira7 • Released 2016-03-23 • Supported By Broken Build • Paid via Atlassian • CommercialNo release notes.1.4.1.jira7Jira Server 7.0.0 - 7.0.112016-01-17Jira 7 compatibility Version 1.4.1.jira7 • Released 2016-01-17 • Supported By Broken Build • Paid via Atlassian • CommercialJira 7 compatibility
1.4.1Jira Server 6.3 - 6.4.142016-01-11Bug fixes ARG-153 - fix exception in Release Burnup report
1.4.0Jira Server 6.3 - 6.4.142015-08-24Burnup for boards with 'Issue Count' estimation statistics added - Burnup for boards with 'Issue Count' estimation statistics added
- Jira 6.3+ and Jira Agile v6.7.0 are supported
- Ported from Jira Agile version report gadget removed
1.3.6Jira Server 6.0 - 6.4.142015-07-22Jira Agile 6.7.6 compatibility Agile Reports 1.3.6 adds compatibility with Jira Agile 6.7.6
1.3.5Jira Server 6.0 - 6.4.142015-05-18Jira Agile integration improvements - significant Jira Agile integration improvements
- Version Report Gadget deprecation for Jira Agile 6.7.0 due to gadget being shipped in Jira Agile itself (more details)
1.3.4Jira Server 6.0 - 6.4.142015-04-24Minor improvements for burnup parameters form - Add legends to burnup parameters form fields
- Increase font contrast for field tooltips
1.3.3Jira Server 6.0 - 6.4.142015-04-20Bug fix for tooltip text cut in burnup gadgets Bug fix for tooltip text cut in burnup gadgets - release notes
1.3.2Jira Server 6.0 - 6.4.142015-03-23Bug fixes for burnup gadgets Velocity tracking tooltip and legend layout fixed
1.3.1Jira Server 6.0 - 6.4.142015-03-15Bug fixes for Agile Burndown and Version Report gadgets Bug fixes for Agile Burndown and Version Report gadgets
1.3Jira Server 6.0 - 6.4.142015-02-17Add different projected scope calculation methods More detailed release notes http://goo.gl/UdiUmP
1.2.1Jira Server 6.0 - 6.3.152015-01-22Performance improvements Much faster data integration with Jira Agile
1.2Jira Server 6.0 - 6.3.152014-10-02Add support for 'Original Time Estimate' in burnup reports In addition to Story Points, Business Value or any other number field Burnup reports now work for boards with estimation statistic set to 'Original Time Estimate'
1.1.5Jira Server 6.0 - 6.3.152014-09-07Jira Agile Release Burndown report as wallboard capable gadget added Now Jira Agile Release Burndown report is also available as wallboard capable gadget. Gadget's width should be at least 610px to correctly display chart.
1.1.4Jira Server 6.0 - 6.3.152014-08-31New gadget added - Jira Agile Version Report Show Jira Agile Version Report as wallboard capable gadget
1.1.3Jira Server 6.0 - 6.3.152014-08-18Fix for loading sprint details in Release Burnup report Sprints without any issues blocked overall Release Burnup report generation process
1.1.2Jira Server 6.0 - 6.3.152014-08-12Wallboard mode gadgets support Now all gadgets added to dashboards alse support wallboard mode
1.1Jira Server 6.0 - 6.3.152014-06-26New reports UI and Jira compatibility fixes - redesign reports UI to follow Atlassian Design Guidelines
- fix compatibility problems with Jira 6.1.4-6.1.6
- bug fixes and general improvements