- Improvements
- Bug fixes
- Versions archived after release are not treated as archived versions
- Sub-task don't be hidden when archived version is disable in Gantt configuration
- Dirty Sprint cell when clicking edit cell and hover out before selecting value
- If the "Working hours per day" in the Jira time tracking settings is set to a decimal value, the estimate will display strangely
- Each time clicking "Refresh" on the operation bar, the name of the (shared) template in the "Add" menu will increase.
Version history
CloudJira Cloud2023-09-06Quick filter improvement 9.14.8.41Jira Data Center 8.13.0 - 9.11.12023-03-09The 8th maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.8.41 • Released 2023-03-09 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Updated bundled libraries
9.14.8.41Jira Server 8.13.0 - 9.11.12023-03-09The 8th maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.8.41 • Released 2023-03-09 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Updated bundled libraries
9.14.7.34Jira Data Center 8.13.0 - 9.6.02023-02-21The 7th maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.7.34 • Released 2023-02-21 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Updated bundled libraries
9.14.7.34Jira Server 8.13.0 - 9.6.02023-02-21The 7th maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.7.34 • Released 2023-02-21 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Updated bundled libraries
9.14.6.25Jira Data Center 8.13.0 - 9.6.02023-01-25The 6th maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.6.25 • Released 2023-01-25 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Improvements
- Migration skips the missing project and continues for the remaining projects
- Update cloud migration library
- Bug fixes
- History is left if updating on Jira directly, but no history if update it on Gantt
- The save button is activated immediately after the Gantt chart is displayed
- Improvements
9.14.6.25Jira Server 8.13.0 - 9.6.02023-01-25The 6th maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.6.25 • Released 2023-01-25 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Improvements
- Migration skips the missing project and continues for the remaining projects
- Update cloud migration library
- Bug fixes
- History is left if updating on Jira directly, but no history if update it on Gantt
- The save button is activated immediately after the Gantt chart is displaye
- Improvements
9.14.5.1Jira Data Center 8.13.0 - 9.5.12022-07-13Support Jira 9 Version 9.14.5.1 • Released 2022-07-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Support Jira 9
- Fixed a bug in Jira 8.16 and above where an error message was displayed after executing MS Project import
9.14.5.1Jira Server 8.13.0 - 9.5.12022-07-13Support Jira 9 Version 9.14.5.1 • Released 2022-07-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Support Jira 9
- Fixed a bug in Jira 8.16 and above where an error message was displayed after executing MS Project import
9.14.4.1Jira Data Center 8.5.0 - 8.22.62022-04-18The fourth maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.4.1 • Released 2022-04-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Patched CVE-2022-0540
9.14.4.1Jira Server 8.5.0 - 8.22.62022-04-18The fourth maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.4.1 • Released 2022-04-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Patched CVE-2022-0540
9.14.3.1Jira Data Center 7.6.0 - 8.22.62022-03-07The third maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.3.1 • Released 2022-03-07 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Fixed a minor bug
9.14.3.1Jira Server 7.6.0 - 8.22.62022-03-07The third maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.3.1 • Released 2022-03-07 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Fixed a minor bug
9.14.2.5Jira Data Center 7.6.0 - 8.22.62022-03-04The second maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.2.5 • Released 2022-03-04 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Update third-party libraries
- Fix Excel export bug that occurs under certain conditions
9.14.2.5Jira Server 7.6.0 - 8.22.62022-03-04The second maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.2.5 • Released 2022-03-04 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Update third-party libraries
- Fix Excel export bug that occurs under certain conditions
9.14.1.1Jira Data Center 7.6.0 - 8.22.62022-02-16The first maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.1.1 • Released 2022-02-16 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Improvement
- Update the cloud migration library
- Improvement
9.14.1.1Jira Server 7.6.0 - 8.22.62022-02-16The first maintenance release for Version 9.14 of WBS Gantt-Chart for Jira Version 9.14.1.1 • Released 2022-02-16 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Improvement
- Update the cloud migration library
- Improvement
9.14.0.3Jira Data Center 7.6.0 - 8.21.12021-04-27Lag/Lead time can now be set for dependencies. Version 9.14.0.3 • Released 2021-04-27 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- New feature
- Bug fix
- Excel export fails in specific environments
- Other
9.14.0.3Jira Server 7.6.0 - 8.21.12021-04-27Lag/Lead time can now be set for dependencies. Version 9.14.0.3 • Released 2021-04-27 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- New feature
- Bug fix
- Excel export fails in specific environments
- Other
9.13.2.1Jira Data Center 7.6.0 - 8.16.12020-12-25The second maintenance release for Version 9.13 of WBS Gantt-Chart for Jira Version 9.13.2.1 • Released 2020-12-25 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Improvement
- CDN support for Data Center
- Improvement
9.13.2.1Jira Server 7.6.0 - 8.16.12020-12-25The second maintenance release for Version 9.13 of WBS Gantt-Chart for Jira Version 9.13.2.1 • Released 2020-12-25 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Improvement
- CDN support for Data Center
- Improvement
9.13.1.1Jira Data Center 7.6.0 - 8.14.12020-11-25The first maintenance release for Version 9.13 of WBS Gantt-Chart for Jira Version 9.13.1.1 • Released 2020-11-25 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Bug fixes
- Save button does not display
- Some Jira users are not treated as owners, even if they belong to the Gantt owner groups
- Bug fixes
9.13.1.1Jira Server 7.6.0 - 8.14.12020-11-25The first maintenance release for Version 9.13 of WBS Gantt-Chart for Jira Version 9.13.1.1 • Released 2020-11-25 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Bug fixes
- Save button does not display
- Some Jira users are not treated as owners, even if they belong to the Gantt owner groups
- Bug fixes
9.13.0.1Jira Data Center 7.6.0 - 8.13.62020-10-09Added the feature to configure gantt bar color Version 9.13.0.1 • Released 2020-10-09 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- New feature
- Gantt color setting using JQL
- Improvements
- Arbitrary number regular holidays can be set
- Field is searchable to add column
- Bug fixes
- Menu collapses sometimes when browser zoom level isn't 100%
- Dependency links aren't displayed if start and finish dates are empty when you open gantt chart
- Name column value is misaligned
- While ticket template mode, created ticket dates can't reflect calendar correctly under some condition
- While ticket template mode, excel export(legacy) feature doesn't work
- New feature
9.13.0.1Jira Server 7.6.0 - 8.13.62020-10-09Added the feature to configure gantt bar color Version 9.13.0.1 • Released 2020-10-09 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- New feature
- Gantt color setting using JQL
- Improvements
- Arbitrary number regular holidays can be set
- Field is searchable to add column
- Bug fixes
- Menu collapses sometimes when browser zoom level isn't 100%
- Dependency links aren't displayed if start and finish dates are empty when you open gantt chart
- Name column value is misaligned
- While ticket template mode, created ticket dates can't reflect calendar correctly under some condition
- While ticket template mode, excel export(legacy) feature doesn't work
- New feature
9.12.0.1Jira Data Center 7.6.0 - 8.12.32020-07-28Users can now change the order of the columns Version 9.12.0.1 • Released 2020-07-28 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew Feature
- Users can now change the order of the columns
Improvements
- Improved sort function for WBS rows with drag and drop
- Specifications adjusted so issues with a 0% "units" are no longer displayed in the resources view tooltip
9.12.0.1Jira Server 7.6.0 - 8.12.32020-07-28Users can now change the order of the columns Version 9.12.0.1 • Released 2020-07-28 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew Feature
- Users can now change the order of the columns
Improvements
- Improved sort function for WBS rows with drag and drop
- Specifications adjusted so issues with a 0% "units" are no longer displayed in the resources view tooltip
9.11.2.5Jira Data Center 7.6.0 - 8.11.12020-07-02The second maintenance release for Version 9.11 of WBS Gantt-Chart for Jira Version 9.11.2.5 • Released 2020-07-02 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Error when creating new issues after displaying the resources view
- Template options not arranged in ascending order when creating issues
- MS Project import function imports incorrect values and hierarchies
- Estimate changes cannot be saved unless time tracking setting is "pretty"
- Job scheduler template does not function with reversed hierarchy links
9.11.2.5Jira Server 7.6.0 - 8.11.12020-07-02The second maintenance release for Version 9.11 of WBS Gantt-Chart for Jira Version 9.11.2.5 • Released 2020-07-02 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Error when creating new issues after displaying the resources view
- Template options not arranged in ascending order when creating issues
- MS Project import function imports incorrect values and hierarchies
- Estimate changes cannot be saved unless time tracking setting is "pretty"
- Job scheduler template does not function with reversed hierarchy links
9.11.1.2Jira Data Center 7.6.0 - 8.10.12020-02-13The first maintenance release for Version 9.11 of WBS Gantt-Chart for Jira Version 9.11.1.2 • Released 2020-02-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialBug fix
- An error occurred during execution of a schedule job
Please see WBS Gantt-Chart for Jira 9.11.1 release notes for the details.
9.11.1.2Jira Server 7.6.0 - 8.10.12020-02-13The first maintenance release for Version 9.11 of WBS Gantt-Chart for Jira Version 9.11.1.2 • Released 2020-02-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialBug fix
- An error occurred during execution of a schedule job
Please see WBS Gantt-Chart for Jira 9.11.1 release notes for the details.
9.11.0.12Jira Data Center 7.6.0 - 8.7.12019-10-03Permissions added for creating and using Gantts Version 9.11.0.12 • Released 2019-10-03 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.11 of WBS Gantt-Chart for Jira release notes for the details.
New features
- Added capability restricting Gantt creation and operation
Improvements
- Multiple texts can be defined for replacement in the issue template
- Copy custom fields and attachments when creating issues from templates
Bug fixes
- Hierarchical structure of issues are broken when creating issues from issue template
- The critical path is not displayed correctly if there is a gap in the schedule
- Incorrect content displayed when hovering a tooltip over the resource view
- User picker column does not work correctly in environments with more than 1000 active users
Others
- Ending support up to Jira 7.5.
9.11.0.12Jira Server 7.6.0 - 8.7.12019-10-03Permissions added for creating and using Gantts Version 9.11.0.12 • Released 2019-10-03 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.11 of WBS Gantt-Chart for Jira release notes for the details.
New features
- Added capability restricting Gantt creation and operation
Improvements
- Multiple texts can be defined for replacement in the issue template
- Copy custom fields and attachments when creating issues from templates
Bug fixes
- Hierarchical structure of issues are broken when creating issues from issue template
- The critical path is not displayed correctly if there is a gap in the schedule
- Incorrect content displayed when hovering a tooltip over the resource view
- User picker column does not work correctly in environments with more than 1000 active users
Others
- Ending support up to Jira 7.5.x
9.10.5.3Jira Data Center 7.2.0 - 8.5.142019-09-13Jira 8.4 compatible Version 9.10.5.3 • Released 2019-09-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Jira 8.4.x compatible
Notice for Microsoft Project users:
If you are using Jira 8.4.0 Data Center, MS Project import feature will not work properly.
Since this problem may be caused by a bug in Jira, we had requested Atlassian to investigate the problem.
9.10.5.3Jira Server 7.2.0 - 8.5.142019-09-13Jira 8.4 compatible Version 9.10.5.3 • Released 2019-09-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial9.10.4.3Jira Data Center 7.2.0 - 8.3.52019-04-16Jira 8.1 compatible Version 9.10.4.3 • Released 2019-04-16 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Jira 8.1.x compatible
9.10.4.3Jira Server 7.2.0 - 8.3.52019-04-16Jira 8.1 compatible Version 9.10.4.3 • Released 2019-04-16 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Jira 8.1.x compatible
9.10.3.3Jira Data Center 7.2.0 - 8.0.32019-03-20Import/export bug fixed Version 9.10.3.3 • Released 2019-03-20 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialBug fixes
- Microsoft Project import cannot be performed with empty start and end dates
- When I run Excel export function in a specific environment, I can not open the exported Excel file
Please see WBS Gantt-Chart for Jira 9.10.3 release notes for the details.
9.10.3.3Jira Server 7.2.0 - 8.0.32019-03-20Import/export bug fixed Version 9.10.3.3 • Released 2019-03-20 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialBug fixes
- Microsoft Project import cannot be performed with empty start and end dates
- When I run Excel export function in a specific environment, I can not open the exported Excel file
Please see WBS Gantt-Chart for Jira 9.10.3 release notes for the details.
9.10.2.1Jira Data Center 7.2.0 - 8.0.32019-02-18We increased the display speed of Recent Gantts Version 9.10.2.1 • Released 2019-02-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Increase display speed of Recent Gantts: The speed of displaying the list of recently displayed/created Gantt has been improved.
Please see WBS Gantt-Chart for Jira 9.10.2 release notes for the details.
9.10.2.1Jira Server 7.2.0 - 8.0.32019-02-18We increased the display speed of Recent Gantts Version 9.10.2.1 • Released 2019-02-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Increase display speed of Recent Gantts: The speed of displaying the list of recently displayed/created Gantt has been improved.
Please see WBS Gantt-Chart for Jira 9.10.2 release notes for the details.
9.10.1.4Jira Data Center 7.2.0 - 8.0.32019-02-12Jira 8.0 compatible Version 9.10.1.4 • Released 2019-02-12 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Jira 8.0.x compatible
9.10.1.4Jira Server 7.2.0 - 8.0.32019-02-12Jira 8.0 compatible Version 9.10.1.4 • Released 2019-02-12 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Jira 8.0.x compatible
9.10.0.13Jira Data Center 7.2.0 - 7.13.182019-01-24You can now directly create Gantt bars on a Gantt chart Version 9.10.0.13 • Released 2019-01-24 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.10 of WBS Gantt-Chart for Jira release notes for the details.
New features
- Create plans easily by using Drag even where no start or finish date is set
- Choose when you jump to your selected point on a Gantt chart
Improvements
- Gantt bar tooltip display updated and multi-lingualized
- Long issue summaries are not obscured by the Gantt bar
- More detail added to tooltip explanations if cells cannot be edited
9.10.0.13Jira Server 7.2.0 - 7.13.182019-01-24You can now directly create Gantt bars on a Gantt chart Version 9.10.0.13 • Released 2019-01-24 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.10 of WBS Gantt-Chart for Jira release notes for the details.
New features
- Create plans easily by using Drag even where no start or finish date is set
- Choose when you jump to your selected point on a Gantt chart
Improvements
- Gantt bar tooltip display updated and multi-lingualized
- Long issue summaries are not obscured by the Gantt bar
- More detail added to tooltip explanations if cells cannot be edited
9.9.1.3Jira Data Center 7.2.0 - 7.13.182018-12-17The first maintenance release for Version 9.9 of WBS Gantt-Chart for Jira Version 9.9.1.3 • Released 2018-12-17 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Browser standard context menu is not displayed in the touch panel compatible environment
Please see WBS Gantt-Chart for Jira 9.9.1 release notes for the details.
9.9.1.3Jira Server 7.2.0 - 7.13.182018-12-17The first maintenance release for Version 9.9 of WBS Gantt-Chart for Jira Version 9.9.1.3 • Released 2018-12-17 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Browser standard context menu is not displayed in the touch panel compatible environment
Please see WBS Gantt-Chart for Jira 9.9.1 release notes for the details.
9.9.0.15Jira Data Center 7.2.0 - 7.13.182018-12-05Tooltip now shows why you cannot edit a cell Version 9.9.0.15 • Released 2018-12-05 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.9 of WBS Gantt-Chart for Jira release notes for the details.
Improvements
- Tooltip shows why you cannot edit a cell
- The issue template in your project can be used without setting
- Column width, display items, and sort order of each Gantt chart are stored for each user
- Microsoft Project import/export feature supports due date field
- Copy epic link if a new parent has epic links when changing parent-child relationship
Bug fixes
- If you deactivate the add-on and re-enable it, the schedule job registered in advance will not work
- Some Gantt chart features are displayed for anonymous users
- If square bracket exists in the full name of issue assignee, the exported XML file can not be read correctly by Microsoft Project
9.9.0.15Jira Server 7.2.0 - 7.13.182018-12-05Tooltip now shows why you cannot edit a cell Version 9.9.0.15 • Released 2018-12-05 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.9 of WBS Gantt-Chart for Jira release notes for the details.
Improvements
- Tooltip shows why you cannot edit a cell
- The issue template in your project can be used without setting
- Column width, display items, and sort order of each Gantt chart are stored for each user
- Microsoft Project import/export feature supports due date field
- Copy epic link if a new parent has epic links when changing parent-child relationship
Bug fixes
- If you deactivate the add-on and re-enable it, the schedule job registered in advance will not work
- Some Gantt chart features are displayed for anonymous users
- If square bracket exists in the full name of issue assignee, the exported XML file can not be read correctly by Microsoft Project
9.8.0.17Jira Data Center 7.2.0 - 7.12.32018-10-02Progress line gives you a better view of a project’s progress status Version 9.8.0.17 • Released 2018-10-02 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.8 of WBS Gantt-Chart for Jira release notes for the details.
New feature
- Display a progress line to see the status of your project
We have added a function enabling you to check the progress of a project by displaying a zig-zag progress line. Taking the date on which you view a project’s status as the start point, a progress line is drawn linking the progress points in each Gantt bar.
Improvements
- You can now create consecutive versions in WBS
Bug fixes
- When an issue is created from an issue template, the issue always has the same due date as in the template
- The progress rate shown on a Gantt bar differs from the actual progress rate, etc.
Other
- Changes in respect of deprecated features
Read WBS Gantt-Chart for Jira 9.8 upgrade notes if you upgrade from the earlier version.
9.8.0.17Jira Server 7.2.0 - 7.12.32018-10-02Progress line gives you a better view of a project’s progress status Version 9.8.0.17 • Released 2018-10-02 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.8 of WBS Gantt-Chart for Jira release notes for the details.
New feature
- Display a progress line to see the status of your project
We have added a function enabling you to check the progress of a project by displaying a zig-zag progress line. Taking the date on which you view a project’s status as the start point, a progress line is drawn linking the progress points in each Gantt bar.
Improvements
- You can now create consecutive versions in WBS
Bug fixes
- When an issue is created from an issue template, the issue always has the same due date as in the template
- The progress rate shown on a Gantt bar differs from the actual progress rate, etc.
Other
- Changes in respect of deprecated features
Read WBS Gantt-Chart for Jira 9.8 upgrade notes if you upgrade from the earlier version.
9.7.3.3Jira Data Center 7.2.0 - 7.12.32018-09-17WBS Gantt-Chart for Jira is a Data Center approved app now! Version 9.7.3.3 • Released 2018-09-17 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- "FY" is added to the year number on Gantt chart header
- To make it easier to understand that the headers are displayed based on the fiscal year when you display the Gantt chart on a quarterly basis, we have added the "FY" (fiscal year) to the year number.
- "FY" is added to the year number on Gantt chart header
9.7.3.3Jira Server 7.2.0 - 7.12.32018-09-18The third maintenance release for Version 9.7 of WBS Gantt-Chart for Jira Version 9.7.3.3 • Released 2018-09-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- "FY" is added to the year number on Gantt chart header
- To make it easier to understand that the headers are displayed based on the fiscal year when you display the Gantt chart on a quarterly basis, we have added the "FY" (fiscal year) to the year number.
- "FY" is added to the year number on Gantt chart header
9.7.2.4Jira Server 7.2.0 - 7.12.32018-08-02The second maintenance release for Version 9.7 of WBS Gantt-Chart for Jira Version 9.7.2.4 • Released 2018-08-02 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImportant notes: Please also read WBS Gantt-Chart for Jira 9.7 release notes before upgrading to the version 9.7.2.
Improvements
- Disable Gantt chart display period jumping when selecting Gantt bar or Due date icon to improve the operability of Gantt chart plan editing
- Improve visibility of issue summary in tooltip displayed when mouseover Gantt bar
Please see Version 9.7.2 of WBS Gantt-Chart for Jira release notes for the details.
9.7.1.3Jira Server 7.2.0 - 7.11.22018-07-24The first maintenance release for Version 9.7 of WBS Gantt-Chart for Jira Version 9.7.1.3 • Released 2018-07-24 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialBug fixes
- Users who do not have Schedule issues permission can edit Due date
- When you update the Due date icon by dragging and dropping, it is saved at the date one day before the displayed Due date
Please see WBS Gantt-Chart for Jira 9.7.1 release notes for the details.
9.7.0.31Jira Server 7.2.0 - 7.11.22018-07-23Easier plan management with displaying due dates in WBS and on a Gantt chart Version 9.7.0.31 • Released 2018-07-23 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.7 of WBS Gantt-Chart for Jira release notes for the details.
New functions
- Issue “Due date” shown in WBS column and displayed as a Gantt chart icon
- Date and Date/time cell formats can be modified by users for international use
- Ranges for quarterly periods (Q1 to Q4) can be set in line with a fiscal year
- Selecting numbered weeks as units in WBS Gantt-chart
Improvements
- Made it possible to disable legacy function (deprecated features) to simplify app functions and settings
- Edit in the user preferences is divided into "hierarchy relationship" and "dependency relationship"
- etc.
Bug fixes
- When a user who does not have authority to change a security level creates an issue, the issue is always created without a security level
- Firefox is not compatible with some environments
- Incorrect content displayed when hovering a tooltip over the resources view
Other
- Support for Jira 7.11.x
- Ending support for Jira 7.1.x
9.6.0.26Jira Server 7.1.0 - 7.10.22018-06-05Gantt bar can now be made thicker for better visibility Version 9.6.0.26 • Released 2018-06-05 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see Version 9.6 of WBS Gantt-Chart for Jira release notes for the details.
New features
- The Gantt bar for a plan can be displayed as a thick bar for improved visibility
In the View menu, you can now switch between displaying or hiding the baseline bar. If the baseline is hidden, the Gantt plan bar is shown as a thick bar.
Improvements
- Reduced wait time for screen display to load
- Issue detail view now easier to use
- Supporting Jira 7.10.x
Bug fixes
- If inline editing is disabled, inline editing can still be performed in the issue view
- Parent issue progress rate is calculated automatically without editing permissions
- Project version progress rate is always displayed as 0%
- A reduced size Gantt chart screen is displayed when specific add-ons are installed
Other
- Legacy Excel export function no longer supported
9.5.1.2Jira Server 7.1.0 - 7.9.22018-05-01The first maintenance release for Version 9.5 of WBS Gantt-Chart for Jira Version 9.5.1.2 • Released 2018-05-01 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovement
- Added a button to access from the add-on management screen to the "Get Started" documentation
Please see Version 9.5.1 of WBS Gantt-Chart for Jira release notes for the details.
9.5.0.39Jira Server 7.1.0 - 7.9.22018-04-17Greater editing capability with issue detail view Version 9.5.0.39 • Released 2018-04-17 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialYou can now check and edit the details of an issue with the issue detail view while you are reviewing the WBS. Please see Version 9.5 of WBS Gantt-Chart for Jira release notes for the details.
New features
- Display issue detail view on screen
We have added a function that enables you to display the issue detail view for any issue that you select in your WBS.
Improvements
- Gantt chart display period jumps to the Gantt bar when a row is selected
- "Please wait" displayed when an issue is created with the issue template
- Translation and display updated for some languages
- Jira 7.9 supported
Bug fixes
- Keyboard cannot be used after using drag-and-drop to rearrange rows
- Focus cell does not move when the bottom row is moved with drag-and-drop
- “Save” button stops working when rows with unsaved data are sorted
- Users who do not have administrator rights cannot move issues directly below a version
- Users displayed in assignee column as potential assignees did not match “assignable users”
and more
9.4.0.36Jira Server 7.1.0 - 7.8.42018-02-21Improved compatibility with Microsoft Project and enhanced interoperability Version 9.4.0.36 • Released 2018-02-21 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialWe have Improved compatibility with Microsoft Project and enhanced interoperability. Please see Version 9.4 of WBS Gantt-Chart for Jira release notes for the details.
New functions and improvements
- Sorting the display order of issues; changing hierarchies with indent/outdent
- Integration with MS Project importer for Jira
- Exporting xml files that are readable in Microsoft Project
- New beta Excel export function updated to an official release
- New setting for using Jira status categories as criteria for warning alerts
- Small changes to menu layout on operations bar
- No more delayed reading of data
Bug fixes
- Auto calculation of progress rate was incorrect if progress rate was edited
- Correction of progress rate errors
- Fixed the blank line at the bottom of the Gantt chart
- Fixed the display fault when clicking the partition bar between WBS and Gantt chart
9.3.1.4Jira Server 7.0.0 - 7.7.42017-11-22This is the first maintenance release for WBS Gantt-Chart for Jira 9.3. Version 9.3.1.4 • Released 2017-11-22 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialImprovements
- Jira 7.6.x now supported
WBS Gantt-Chart for Jira supports Jira 7.6.x. This means you can now apply "Priority scheme" configuration settings, the new feature rolled out with Jira 7.6.0, to WBS Gantt-Chart for Jira.
Bug fixes
- Editing time period columns in German
Previously, users could not edit time period columns when using WBS Gantt-Chart in German. This bug has now been fixed.
See WBS Gantt-Chart for Jira 9.3.1 release notes for the details.
9.3.0.16Jira Server 7.0.0 - 7.5.42017-11-07Localized in Korean, German and Russian Version 9.3.0.16 • Released 2017-11-07 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialThe Ricksoft team is proud to announce the release of WBS Gantt-Chart for Jira 9.3.
- Localized in Korean, German and Russian
In addition to the existing Japanese and French language settings, this release is also localized for Korean, German and Russian users. Changing the default language settings in Jira will also switch the default display language for WBS Gantt-Chart for Jira.
There are some additional improvements and fixed bugs in this new version. Please see WBS Gantt-Chart for Jira 9.3 release notes for the details.
Our “public tracker” for WBS Gantt-Chart for Jira is launched today. You can use it to make suggestions, or to report bugs for instance, and we will do our best to respond. For the existing requests and bugs, we will create related issues in this Jira public tracker over the following couple of months. Stay tuned.
p.s.
We would like to thank MOUSoft , South Korea, for their help with the multilingual localization for this release.
9.2.2.7Jira Server 7.0.0 - 7.5.42017-10-18This is the second maintenance release for WBS Gantt-Chart for Jira 9.2. Version 9.2.2.7 • Released 2017-10-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialWe have made some minor improvements and fixed some bugs.
Improvements
- Leading zero not required when inputting dates
- Unnecessary commas removed from Gantt list view in the administrator column
Bug fixes
- Problem with child issues disappearing from Gantt-Chart screen
- Problem with ‘g’ + ‘w’ key shortcutIncorrect display when addressable URL filter IDs or Gantt IDs are entered as numerical values in full-width format
Please see WBS Gantt-Chart for Jira 9.2.2 release notes for the details.
9.2.1.5Jira Server 7.0.0 - 7.5.42017-09-08This is the first maintenance release for WBS Gantt-Chart for Jira 9.2. Version 9.2.1.5 • Released 2017-09-08 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Row color change on mouseover
- Minor changes on the buttons in the operations toolbar
- Fixed: When you changed the display period of the Gantt chart by clicking a button, it remained pressed-down status.
Please see WBS Gantt-Chart for Jira 9.2.1 release notes for the details.
9.2.0.16Jira Server 7.0.0 - 7.5.42017-08-30Improved UI with Redesigned Operations Toolbar Version 9.2.0.16 • Released 2017-08-30 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialThe Ricksoft team is proud to announce the release of WBS Gantt-Chart for Jira 9.2. We have improved the user interface and user experience with a redesigned operations toolbar.
Redesigned operations toolbar
- Redesigned the operations toolbar on the WBS Gantt-Chart screen in order to improve its functionality
- The new toolbar is simple and easy to understand, and easy for newcomers to use
Use Sprint in planned date fields
- Previously you could select Create date, Due date, Date custom field, or Date and time custom field for the start date or end date of an issue
- Now you can also select Sprint
There are some additional improvements and fixed bugs in this new version. Please see WBS Gantt-Chart for Jira 9.2 release notes for the details.
9.1.0.19Jira Server 6.4 - 7.4.62017-06-22Milestones and four types of Task Links Version 9.1.0.19 • Released 2017-06-22 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialPlease see WBS Gantt-Chart for Jira 9.1 release notes for the details.
In this release, we have focused on improving the user experience for customers who are already familiar with Microsoft Project. The new features are Milestones and four types of Task Links. We think users will find these very helpful.
Milestone
Tasks which have a duration of ‘0’ days are now displayed as a Milestone.
Four types of Task Links
In previous versions, the only available task link or dependency was a ‘Finish-to-Start’ relationship. In Version 9.1 we have added three more relationships, so we now four types of Task Links as follows:
- ‘Finish-to-Start’
- ‘Start-to-Start’
- ‘Start-to-Finish’
- ‘Finish-to-Finish’
There are a couple of additional improvements in this new version. Again, please see the release notes for more details.
9.0.3.1Jira Server 6.4 - 7.3.92017-05-17This is the third maintenance release for WBS Gantt-Chart for Jira 9.0. Version 9.0.3.1 • Released 2017-05-17 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- A 404 error happened after updating some configurations. Fixed.
- Integration with Excel like Issue Editor for Jira did not work. Fixed. Need Excel like Issue Editor for Jira 1.7.1 or later.
9.0.2.2Jira Server 6.4 - 7.3.92017-03-28This is the second maintenance release for WBS Gantt-Chart for Jira 9.0. Version 9.0.2.2 • Released 2017-03-28 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Context menu on right click does not work with Google Chrome 57. Fixed.
8.7.1.2Jira Server 6.4 - 7.3.92017-03-28This is the first maintenance release for WBS Gantt-Chart for 8.7. Version 8.7.1.2 • Released 2017-03-28 • Supported By Ricksoft, Inc. • Paid via Atlassian • Commercial- Context menu on right click does not work with Google Chrome 57. Fixed.
9.0.1.3Jira Server 6.4 - 7.3.92017-03-23This is the first maintenance release for WBS Gantt-Chart for Jira 9.0. Version 9.0.1.3 • Released 2017-03-23 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialThis is a maintenance release. The following items were fixed or updated:
- Drag-and-drop tickets: Unable to drag-and-drop a ticket with unloaded child tickets to change hierarchical structure. Fixed.
- Warning icons: Green warning icons do not take holiday calendar into consideration. Fixed.
- Warning icons: Red warning icons appear on the end date of a ticket. Fixed so they do not display.
9.0.0.10Jira Server 6.4 - 7.3.92017-03-02New Gantt Customization and Faster Processing Version 9.0.0.10 • Released 2017-03-02 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialVersion 9 of WBS Gantt-Chart for Jira incorporates a new feature called "Gantt", which works just like a Jira board. Gantt gives users a customizable view of their project. Previously, you needed to Jira administrator access to do this. Now you can create and customize your own Gantts without having to request administrator permission.
We haven’t just added new features to Version 9. We’ve also improved the performance. As we showed you in the test results shared on the blog, this version runs 25% faster than before, processing large ticket volumes at high speed.
Other news in this release:
- Added the feature to hide Issue Editor button
- Added regular holiday specification to the calendar setting
- Changed the formula to calculate percent done by "Calculate with Time Tracking automatically"
- Shortcut keys are displayed on tooltip of save button
Fixed in this release:
- Fixed the bug that the project which a user does not have a view permission is displayed in the "more..." view
8.7.0.8Jira Server 6.4 - 7.3.92016-11-29Enhanced several features and fixed some bugs Version 8.7.0.8 • Released 2016-11-29 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Added a short cut to save.
- Compatible with Jira project navigation.
Fixed in this release:
- Fixed to create tickets from a ticket template in order of plan date.
- Fixed the bug that several columns are not sorted correctly.
- Fixed to sort user drop down options in order of name.
- Fixed the bug that context is not considered in displaying and editing an extra column.
- Fixed the bug that permission is not considered in editing an extra column.
- Fixed the bug that a hierarchy link is not created when a child ticket is created by clicking the button on the issue screen.
- Fixed the bug that the filter of a user picker is not considered when editing a user extra column.
- Fixed the bug that plan dates of new created tickets are not set correctly when other project ticket is included in a ticket template.
- Fixed the bug that WBS Gantt-Chart is not displayed when a project key is changed in Jira 6.4.
8.6.0.13Jira Server 6.4 - 7.2.152016-09-29Enhancing auto schedule correction Version 8.6.0.13 • Released 2016-09-29 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Added "Manual mode" which prevents tickets from being affected by "Auto Correct Schedule" and "Cascade Changes".
Fixed in this release:
- Changed "Recalculating Parents & Children" into "Auto Correct Schedule".
- Fixed the bug that the percent dones of parent tickets shows "0%" when "Auto Correct Schedule" is enabled.
- Fixed the bug that percent done does not become 100% when "AUTO 100%" is enabled.
8.5.0.3Jira Server 6.3 - 7.2.152016-06-30Available in French Version 8.5.0.3 • Released 2016-06-30 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Available in French.
8.4.0.11Jira Server 6.0 - 7.1.102016-05-12Added some features to the operation bar. Version 8.4.0.11 • Released 2016-05-12 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Added "Day", "Quarter", and "Year" to display units.
- Added "Today" button to jump to the today line in the gantt chart.
- Added "Issue Editor" button to start Issue Editor for Jira.
Fixed in this release:
- Fixed the bug that a ticket template name cannot be changed.
8.3.4.2Jira Server 6.0 - 7.1.102016-04-14Fixed some bugs Version 8.3.4.2 • Released 2016-04-14 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release:
- Fixed the bug that tickets cannot be converted into ticket template.
- Fixed the bug that an epic name is not updated correctly.
8.3.3.11Jira Server 6.0 - 7.1.102016-04-07Fixed some bugs Version 8.3.3.11 • Released 2016-04-07 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release:
- Fixed the bug that the user whose username was changed cannot be assigned.
- Fixed the bug that date and datetime cannot be saved.
8.3.2.9Jira Server 6.0 - 7.1.102016-03-23Fixed some bugs Version 8.3.2.9 • Released 2016-03-23 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release:
- Fixed the bug that an error occurs when a planned date is left blank and saved.
- Fixed the bug that components is not updated when they are left blank and saved.
- Extra time spent column is updated to readonly.
8.3.1.7Jira Server 6.0 - 7.1.102016-03-18Fixed a bug Version 8.3.1.7 • Released 2016-03-18 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release:
- Fixed the bug that NullPointerException occurs when an issue is updated.
8.3.0.6Jira Server 6.0 - 7.1.102016-03-17User Interface Renewal Version 8.3.0.6 • Released 2016-03-17 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Renewed user interface.
Fixed in this release:
- Fixed to process "When an issue is resolved, the percent done automatically becomes 100%" and "When an issue is re-opened, the percent done automatically becomes 0%" only when an issue is resolved or reopened.
- Fixed the bug that invalid histories are recorded when the "Original Estimate" or "Remaining Estimate" extra column is edited.
8.2.2.2Jira Server 6.0 - 7.1.102016-02-19Compatible with Jira 7.1 Version 8.2.2.2 • Released 2016-02-19 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Compatible with Jira 7.1.
8.2.1.3Jira Server 6.0 - 7.0.112016-02-12Fixed some bugs Version 8.2.1.3 • Released 2016-02-12 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release:
- Fixed the bug that hierarchies and dependencies may not be displayed correctly if issue link type name is edited on Jira 7.0+.
- Fixed the bug that Excel-downloaded WBS Gantt-Chart may not be displayed in some language.
- Fixed the bug that a ticket can be dropped on depended tickets.
- Fixed the bug that tickets with newly-added issue type are not displayed in "displaying all issue type" mode.
8.2.0.6Jira Server 6.0 - 7.0.112015-12-11Improved WBS displayed based on epic link Version 8.2.0.6 • Released 2015-12-11 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Added the option not to display tickets under epic when they have both parent issue and epic link.
8.1.0.4Jira Server 6.0 - 7.0.112015-10-09Compatible with Jira 7.0 Version 8.1.0.4 • Released 2015-10-09 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release:
- Compatible with Jira 7.0.
- Add a feature to convert ticket into ticket template.
- Display an assignee avatar.
Fixed in this release:
- Fixed the bug that more than one same date can be set on holidays.
- Fixed the bug that holidays are not displayed correctly when the filtered WBS Gantt-Chart is exported.
8.0.0.12Jira Server 6.0 - 6.4.142015-08-13Version enhancements & editing extra columns Version 8.0.0.12 • Released 2015-08-13 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release
- Displaying gantt bars for versions.
- Editing and deleting versions.
- Editing extra columns.
- Displaying all issue types on WBS.
Fixed in this release
- Fixed for Jira administrators to configure WBS Gantt-Chart.
- Fixed the bug that progress bars are displayed longer than actual on an exported Excel.
- Fixed the bug that WBS Gantt-Chart makes no response on IE 8.
7.13.1.3Jira Server 5.1 - 6.4.142015-06-19Scheduled Job Enhancement Version 7.13.1.3 • Released 2015-06-19 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release
- Added a scheduled job template to calculate planned dates and progress from work logs.
- Added a scheduled job template to calculate a parent ticket progress from child ticket duration and progress.
Fixed in this release
- Fixed to set custom fields with date picker or date time picker type to a scheduled task.
- Fixed the bug that long project or filter name is displayed without abbreviation.
- Fixed the bug that ticket configuration is not reflected correctly.
7.13.0.10Jira Server 5.1 - 6.4.142015-05-28Scheduled Jobs and Critical Paths Version 7.13.0.10 • Released 2015-05-28 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release
- Execute scheduled jobs
- Display critical paths
Fixed in this release
- Improved to display WBS Gantt-Chart in a ticket template mode when clicking "Browse this issue in WBS Gantt-Chart" in the issue page of ticket template and related ticket.
- Fixed the bug that tickets displayed in WBS Gantt-Chart less than "Maximum number of displayable tickets".
- Fixed the bug that dependency cannot be created.
7.12.1.3Jira Server 5.1 - 6.4.142015-05-26Fixed a bug Version 7.12.1.3 • Released 2015-05-26 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release
- Fixed the bug that the submenu of a context menu cannot be selected in Google Chrome 43.
7.12.0.7Jira Server 5.1 - 6.4.142015-04-20Drag & drop ticket, share ticket templates, and Jira 6.4 compatible Version 7.12.0.7 • Released 2015-04-20 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release
- Compatible with Jira 6.4
- Edit ticket hierarchy by dragging-and-dropping a ticket.
- Share ticket templates of a specified project with all projects.
- Extract ticket templates and related tickets dividing from other tickets.
Fixed in this release
- Improved to adjust planned dates to start date of an original ticket when creating tickets from ticket templates.
- Improved fields copied from an original ticket when creating a ticket.
- Fixed the bug that the WBS Gantt-Chart start date slips off when switching between a week view and a month view.
Notes in this release
- When versioning up, data extracting ticket templates and related tickets will be created. It may take much time to version up if there are many ticket templates and related tickets.
- From this version, calendars are not applied in ticket template mode. When creating tickets from ticket templates, WBS is made longer than expected. It is recommended to review duration of related tickets.
7.11.0Jira Server 5.1 - 6.3.152015-03-03Enhancing WBS Version 7.11.0 • Released 2015-03-03 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release
- Display extra fields
- Calculate percent done automatically
7.10.2Jira Server 5.1 - 6.3.152015-02-27Performance improvement Version 7.10.2 • Released 2015-02-27 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialFixed in this release
- Performance improvement to clean ticket cache.
7.10.1Jira Server 5.1 - 6.3.152015-02-04A feature supporting to develop resources plan Version 7.10.1 • Released 2015-02-04 • Supported By Ricksoft, Inc. • Paid via Atlassian • CommercialNew in this release
- a feature supporting to develop resources plan
Fixed in this release
- Fixed the bug that issue type icons beginning with "http" were not displayed
- Fixed the bug that some progress rates did not become 100% when "Recalculate Parents & Children" is checked
Also, the following bugs are still existed.
- The bug that tickets with Plan End Date unset are not displayed in Resources View
- The bug that the only first period of the ticket list is displayed in the tooltip of the Resource View when resources bars with the same total Units come consecutively
7.9.1Jira Server 5.1 - 6.3.152014-12-24Fixed some bugs Fixed in this release
- The bug that nodes cannot be expanded in Microsoft SQL Server.
7.9.0Jira Server 5.1 - 6.3.152014-12-08Recalculate Parents & Children, Copy multiple tickets, etc. New in this release
- Recalculate parent & child tickets (Added “Recalculate Children” in addition to the existing “Recalculate Parents”)
- Copy multiple tickets (more than one ticket)
- Set a default date when a ticket is created
Fixed in this release
- The bug that the progress bar is displayed longer than the actual one
- The bug that information displayed on WBS Gantt-Chart is not applied when being exported to Excel with “Display according to the settings below” checked
- The bug that some data cannot be sorted correctly
- XSS vulnerability
7.8.1Jira Server 5.1 - 6.3.152014-10-31Fixed some bugs Fixed in this release
- Fixed the bug that WBS does not display.
7.8.0Jira Server 5.1 - 6.3.152014-10-23Export to Excel feature New in this release
- Export to Excel feature
Fixed in this release
- Fixed the bug that tickets are displayed under a different project
7.7.2Jira Server 5.1 - 6.3.152014-09-24Fixed some bugs Fixed in this release
- Fixed the bug that the changes cannot be saved when tickets under Ticket templates are edited.
7.7.1Jira Server 5.1 - 6.3.152014-09-22Fixed some bugs Fixed in this release
- Fixed the bug that WBS does not display.
- Fixed the bug that $ is not replaced for the input text when tickets are created from ticket templates.
7.7.0Jira Server 5.1 - 6.3.152014-09-16Ticket template feature & Issue key and status display New in this release
- Ticket template feature
- Issue key and status display
Fixed in this release
- Fixed the bug that Start Date, End Date and Percent Done are displayed in tickets that do not have a ticket configuration.
- Fixed the bug that a save reminder does not disappear when an editing ticket is deleted.
- Fixed to copy a description when copying a ticket.
- Fixed to update a "Current Project" when opening a project-specified WBS Gantt-Chart.
7.6.1Jira Server 5.1 - 6.3.152014-08-22Performance Improvement Fixed in this release
- Performance Improvement.
7.6.0Jira Server 5.1 - 6.3.152014-07-31Fixed some bugs Fixed in this release
- Fixed not to edit or delete tickets displayed in gray (version excluded and display excluded).
- Fixed the bug that project holidays are not applied to project-specific WBS Gantt-Chart.
- Fixed the bug that tickets can be created in an archived version.
- Fixed the bug that some tickets are not deleted when deleting tickets.
- Fixed the bug that Epic name is overwritten by a ticket name when a ticket with Epic issue type is edited other than the ticket name.
7.5.0Jira Server 5.1 - 6.3.152014-07-11Compatible with Jira Data Center New in this release
- Compatible with Jira Data Center
- Schedule by duration
- Create successor ticket
7.4.2Jira Server 5.1 - 6.2.72014-06-27Fixed some bugs Fixed in this release
- Fixed the bug that tickets set hidden can no longer be set back to displayable.
- Fixed the bug that deleting tickets without a child ticket shows a dialog to confirm to delete a child ticket.
7.3.0Jira Server 5.1 - 6.2.72014-03-18Ticket configuration improvements - The Issue Types that allow child tickets to be created under a ticket are now selectable either "Specify individually" or "All tickets".
Note: to upgrade from 7.2.0
In 7.2.0, sub-tasks were able to be created from tickets other than sub-tasks, however, in 7.3.0, it needs to be configured seprately. Please add sub-tasks to child tickets of each issue type in the ticket configuration.
7.2.0Jira Server 5.1 - 6.1.92014-02-28WBS Gantt-Chart for Jira now supports Jira Agile Epics. New in this release
- Epics of Jira Agile can be displayed as parent-child relationship of WBS Gantt-Chart.
- The custom fields of DateTime can be displayed as the date and time fields of WBS Gantt-Chart.
- Sub-tasks can be created in WBS Gantt-Chart regardless of the configuration of a child ticket of a ticket.
Fixed in this release
- Issue types are displayed in the sub-menu of "Create ticket" under a project or a version in WBS Gantt-Chart even after tickets' root configuration is excluded.
7.1.0Jira Server 5.1 - 6.1.92014-02-17WBS Gantt-Chart for Jira now supports Marketplace Paid licenses New in this release
WBS Gantt-Chart for Jira now supports Marketplace Paid licenses
Current Customers: We've migrated your WBS Gantt-Chart for Jira issued license into MyAtlassian
Fixed in this release
Ticket-related settings Jira Agile to initial deployment is not created.
Users do not have edit permissions, can select a baseline of the version or the project.
7.0.0Jira Server 5.1 - 6.1.92014-01-22New features and usability improvements New in this release
以下の機能を追加しました。
- プロジェクト、およびバージョンからチケットを作成
以下の対応を行いました。
- 表示設定、およびチケット構造設定をXMLからGUIに変更
- トップナビゲーションバーのメニューが長くなり過ぎないように修正
以下の仕様を変更しました。
- 新規作成された子チケットのチケット名 旧:○○(作成元チケット名)のコピー 新:○○(作成元チケット名)の××(選択した課題タイプ名)
- 新規作成されたチケットの担当者、優先度 旧:作成元が未設定の場合、空 新:作成元が未設定の場合、デフォルト値を設定
6.1.6b_20131112Jira Server 6.1 - 6.1.92013-11-12Release 6.1.6 for Jira 6.1 minor bug fixes Version 6.1.6b_20131112 • Released 2013-11-12 • Supported By Ricksoft, Inc. • Paid via Vendor • CommercialFixed in this release
- 「全て展開」で展開したチケットの編集がWBSに反映されない場合がある
なお、旧バージョンをアンインストールしてからインストールしてください。
6.0.6b_20131112Jira Server 6.0 - 6.0.82013-11-12Release 6.0.6 for Jira 6.0 minor bug fixes Version 6.0.6b_20131112 • Released 2013-11-12 • Supported By Ricksoft, Inc. • Paid via Vendor • CommercialFixed in this release
- Jira6.0で課題作成ダイアログが閉じない場合がある
- 「全て展開」で展開したチケットの編集がWBSに反映されない場合がある
なお、旧バージョンをアンインストールしてからインストールしてください。
5.2.6b_20131112Jira Server 5.2 - 5.2.112013-11-12Release 5.2.6 for Jira 5.2 minor bug fixes Version 5.2.6b_20131112 • Released 2013-11-12 • Supported By Ricksoft, Inc. • Paid via Vendor • CommercialFixed in this release
- 「全て展開」で展開したチケットの編集がWBSに反映されない場合がある
なお、旧バージョンをアンインストールしてからインストールしてください。
5.1.6b_20131112Jira Server 5.1 - 5.1.82013-11-12Release 5.1.6 for Jira 5.1 minor bug fixes Version 5.1.6b_20131112 • Released 2013-11-12 • Supported By Ricksoft, Inc. • Paid via Vendor • CommercialFixed in this release
- 「全て展開」で展開したチケットの編集がWBSに反映されない場合がある
なお、旧バージョンをアンインストールしてからインストールしてください。
5.0.6b_20131112Jira Server 5.0 - 5.0.72013-11-12Release 5.0.6 for Jira 5.0 minor bug fixes Version 5.0.6b_20131112 • Released 2013-11-12 • Supported By Ricksoft, Inc. • Paid via Vendor • CommercialFixed in this release
- 「全て展開」で展開したチケットの編集がWBSに反映されない場合がある
なお、旧バージョンをアンインストールしてからインストールしてください。